Files
jobtrackingapp/docs/redesign/phase-9/CV_QA_2026-10-26_ADDENDUM.md
T

8 lines
1.1 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# CV integration QA preservation addendum
26 October 2026. CV-QA begins at ef425c2 on `test/cv-integration-acceptance`. This dated addendum does not replace the historical Phase9 matrices or change any of the 57 group qualification states. All 33 routes and aliases remain.
Directly affected owners: PRES-C01/C02/C03, C05–C10/C12, W05/W06/W07/W12, E05/E07/E08/E09 and S04/S05. Canonical profile, per-CV overrides, append-only revisions, letter/application versions and frozen package/binary ownership remain distinct. PRES-C11/live model qualification remains withheld. Other groups retain full regression obligations.
The authoritative CV-QA field matrix and checkpoint ledger are `../../cv-integration-qa/ARCHITECTURE_AND_COVERAGE.md` and `../../cv-integration-qa/PLAN.md`. Final per-group reconciliation will be added there without erasing old observations. Broad Phase10 deletion remains ineligible without candidate-specific caller/route/compatibility/test evidence; production gates remain independent. No cleanup or production operation is started by this addendum.