Files
jobtrackingapp/docs/redesign/phase-6/p6-05/PRESERVATION.md
T

23 KiB
Raw Blame History

P6-05 — Preservation reconciliation

All 57 original protected groups remain in scope. The contract is the full functionality ledger, with its Phase 2 executable anchors, Phase 3 impact, Phase 4 foundation acceptance and current Phase 5 reconciliation. A shorter row below never replaces an original sub-capability.

Authority and evidence scope

The P5-15-06 final handoff establishes implemented-scope CONDITIONAL GO, original full Phase 5 NOT COMPLETE, and PRODUCTION NO-GO. The authoritative handoff is 9528504866054da10e20d5196e65de536c4c9499, following last Phase 5 application change 22455bba0a016f0cefabde46c539df588f789667; historical Phase 2/4/P5-14 totals are superseded for baseline accounting.

Executed Phase 5 baseline Result and scope
Backend 1,033 passing; authorization/tenant/integrity suites included
Frontend 498 passing in 83 suites
Ordinary browser / separate diagnostics 148 / 3 passing; separate lanes, no skips/retries/expected failures
Sidecar / focused AI / revision / real HTTP 49 / 108 / 5 / 2; AI and revision are backend subsets
Rate-limit / ingress / PDF admission / configuration 9 / 6 / 1 / 3; local evidence, no F04 deployed qualification
Original render corpus / Settings exports 16 cases, 36 preview=36 PDF pages / 8 cases, 24=24 pages; original tolerances
Full-group / route acceptance 56 PARTIAL +1 DEFERRED =57; 32 route patterns PARTIAL

Fresh Phase 6 execution belongs to the P6-05 aggregate manifest and backend manifest, with checkpoint-specific behavioral proof linked from the Phase 6 report. Those records, rather than this inherited table, determine fresh counts, source, commands and observed failures. A suite total does not certify an unexecuted sub-workflow. Focused subsets are never added to complete-suite totals.

Full-original-group disposition remains 0 PASS /56 PARTIAL /0 FAIL /1 DEFERRED =57, unless a fresh demonstrated failure is explicitly recorded in the final manifest. PARTIAL means retained behavior plus finite scoped evidence and unmet mandatory whole-workflow/human/provider/deployed obligations; it does not mean 56 proven defects. C11 remains explicitly deferred. Current scoped repairs may close their exact feedback defect without upgrading a whole group to PASS or diagnosing an older server exception.

The table's evidence column links the applicable implementation/native acceptance records. The source-linked Phase 5 matrix supplies every individual frontend/backend executable anchor; all are reconciled against the original ledger. P6 fresh execution is additionally governed by the manifests above. Manual checks remain M01–M13, not agent or emulator substitutes.

All 57 contracts

Contract / preserved boundary Implementation and behavioral evidence Full-group status Mandatory limitation / remaining acceptance
PRES-E01 Public product, Free/Pro comparison and honest unavailable billing Retained public route census, ledger/planCatalog tests in original matrix PARTIAL Public-page complete mobile/keyboard review and actual billing availability; no invented prices
PRES-E02 Local login/register/remember, Turnstile, resend/reset/verify AUTH-01 native repair; complete return URL/security proof PARTIAL Real mail/reset submit/Turnstile and token expiry/used-token cases; query loss is repaired for its tested scope
PRES-E03 Google/Microsoft sign-in/link/relink, popup state/origin Shared return-boundary proof, retained provider owners PARTIAL Actual consent/popups/revoked grants/relink; mailbox grants remain separate from sign-in
PRES-E04 2FA/recovery/setup/disable/trusted-device revocation Retained identity census, TwoFactor/Sessions tests PARTIAL Real authenticator/recovery and reader/trusted-device traversal; sensitive confirmations retained
PRES-E05 Sessions/current-device/revoke/logout Shell/private lifecycle, Sessions/account-scoped tests PARTIAL Native session-card refresh after remote revocation and complete device/AT acceptance
PRES-E06 Avatar/account identity/email/password Retained /profile and confirmation route PARTIAL Complete avatar/remove/password/email-change native flow; account identity remains distinct from career facts
PRES-E07 Expanded/rail/mobile navigation, active route, commands Grouped shell, utilities, drawer repair PARTIAL Spoken names/live state, settled drawer AX-name triage and historical command/dialog timing; no route silently hidden
PRES-E08 Themes, EN/NB hydration, shared toast/confirm/prompt/errors Semantic foundations, shared readiness, P6 corrections PARTIAL Full OS/locale/state cross-product, contrast/incomplete axe, reader/reflow; save feedback is distinct from server500 root-cause repair
PRES-E09 Account switch/stale read-write/BFCache/revalidation Native owned-resource protection, auth expiry/logout proof PARTIAL Broader BFCache/offline/old-bundle/deployed cases; presentation never becomes authorization
PRES-J01 NAV search/filter/sort/source/freshness/details Retained Discover owner PARTIAL Live NAV availability/freshness and long-result keyboard/narrow traversal
PRES-J02 Named saved searches/run/delete/alerts/results/dismiss Native saved-search repair PARTIAL Actual scheduler-to-owned-notification delivery, human/mobile delete acceptance and intended-provider qualification; deterministic runner is not live NAV
PRES-J03 Reviewed manual/URL/paste creation/company/tags/dates/duplicates Jobs/Add, shared AddJobModal; transport boundary tests PARTIAL Duplicate/company/date/interrupted creation and distinct creation-intent idempotency debt; preview/open is no-write
PRES-J04 Extension/bookmarklet/share capture and optional post-create artifacts Capture retained, captureUrl/extension contracts PARTIAL Installed extension/share/no-replay and attachment failure recovery; keep payload and safe-return contracts
PRES-J05 Search/filter/sort/pages/columns/saved views/row-card actions Jobs presentation, shared Table/Board query PARTIAL Full saved-view CRUD/dirty page-size/history combinations and supported capacity; server query semantics unchanged
PRES-J06 Bulk status/delete/restore, soft-delete/Trash, edit Native Jobs/Trash, selection/view integration PARTIAL Complete selected-scope/partial-failure/dirty/manual combinations; no hard-delete substitution
PRES-J07 Board groups/custom statuses/pointer-keyboard move/cancel/menu Board, query parity, 200/1,000 exact membership PARTIAL Physical drag/touch/browser variants and O(N) full-array capacity; no capped hidden results or pipeline redefinition
PRES-J08 Company/contact/source/pipeline-date/history editing Retained Companies owner, P6 shared feedback checkpoint PARTIAL Scoped in-modal failure proof follows P6 manifest; complete contact/date/source-link and human acceptance remain
PRES-J09 Recorded offer compensation/deadline/notes/source Offer/report source acceptance, retained OfferComparisonPage PARTIAL Many-offer mobile/currency/date acceptance; no invented salary normalization
PRES-J10 CSV/JSON export/import/conversion/counts Retained Settings Data, CSV/blob/formula-safety tests PARTIAL Complete native roundtrip and target spreadsheet compatibility; job import is not account restore
PRES-W01 Full job workspace/legacy links/optional overlay Seven-section native workspace, route/readiness proof PARTIAL followMode metadata retained; compose consumer deferred. P5-05 optional preview lacks production host; full page remains
PRES-W02 Details/status/next action/dates/contact/timeline Overview/header, section composition PARTIAL Stored-event localisation/timezones/status-reload combinations and separate job revision debt
PRES-W03 Analysis/match/gaps/strategy/reviewed status suggestions Contextual existing owners, workflow/AI tests PARTIAL Real-model truthfulness/freshness/cancel quality; route entry never auto-generates; unrelated AI survives C11 withholding
PRES-W04 Checklist CRUD/completion/order/next action Retained checklist composition, checklist tests PARTIAL Mobile interruption/edit/delete/reader; item identity and keyboard alternatives retained; no invented due-date schema
PRES-W05 Select/attach/create/tailor CV and source context Native attach/tailor/package readiness, Application section PARTIAL P2-D01 remains ordinary passing; broader attach-render/model/deployed combinations remain; owner/job association unchanged
PRES-W06 Manual/AI letter review/reject/apply/history/dirty guard Native Application/Letter, readiness PARTIAL Complete native history/reject/reader/model combinations; no canonical mutation or auto-send
PRES-W07 Drafts/frozen package versions/archived binaries Native SQLite/source-mutation/archive ZIP proof PARTIAL Actual production restore/rollback/all-storage combinations; current edits/delete cannot mutate frozen bytes; capture is not delivery
PRES-W08 Upload/drop/category/name/consent/preview/download/delete Documents section, native keyboard picker repair PARTIAL Physical drop, full rename/download/reader and deployed storage; AI inclusion remains explicit
PRES-W09 Interview categories/questions/answers/manual removal/AI review Interview section, interview persistence/context tests PARTIAL Real-model and physical software-keyboard/reload/reader; preparation is not a scheduled interview
PRES-W10 Debrief/follow-up content/date/readiness Retained interview/follow-up PARTIAL Timezones/provider delivery; followMode reviewed compose UI remains deferred, no automatic send
PRES-W11 Reminders/rules/notifications/ICS/Google-Outlook events Rules draft/error/retry repair, retained calendar contracts PARTIAL F21 DST/date-only/offsets, real provider events/scheduler delivery and historical unconfirmed Rules500 cause
PRES-W12 Async progress/failure/retry/cancel/notifications Operation and bell entries, operation/worker tests PARTIAL Disconnect/reconnect and F20 enabled-worker fault recovery; stable operation IDs/no duplicate starts
PRES-C01 All canonical structured/long-tail/custom career fields Source isolation, canonical service/controller tests PARTIAL Full long-tail mobile save and profile concurrency; singleton source distinct from identified variants
PRES-C02 Overview/completeness/import/raw copy/avatar/history restore Retained Career owner, overview/profile/history tests PARTIAL Complete native historical restore/clipboard/avatar/reader; live inherited CVs may reflect later source changes
PRES-C03 Upload/extract/reprocess/diff/low-confidence select/accept/discard/retry Native picker repair, extraction/diff tests PARTIAL Scanned/OCR corpus and complete low-confidence/discard/native-reader flow; extracted proposal is not canonical truth
PRES-C04 Evidence sources/categories/tags/add/list/delete Retained evidence owner, evidence frontend/API tests PARTIAL Many-item/delete/keyboard acceptance; evidence stays sourced and owner-bound
PRES-C05 Library CRUD/gallery/share/publication/PDF Gallery/control reuse, library/publication tests PARTIAL Library migration not complete; publish/unpublish/old-slug revocation and every template combination required
PRES-C06 Studio tabs/save states/debounce/pages/fit/mobile panes Frame, preview, hidden-initial repair PARTIAL Physical keyboard/touch/AT and broader short-height/wrapped/deployed cases; one editor/save/preview owner
PRES-C07 Visibility/order/custom sections/item-document overrides/reset Source/override editing, nested ownership proof PARTIAL Physical selection/drop/all-browser and exhaustive reset/inheritance combinations; sibling/canonical/frozen separation retained
PRES-C08 Capability-aware typography/color/header/skills/sidebar/photo Nine-template control matrix PARTIAL Production fonts/portraits/wrapped lines/custom color/reader; schematic gallery is not final-photo qualification
PRES-C09 A4/Letter/density/margins/dates/document locale/section layout Advanced controls, native pagination repair PARTIAL Advanced cross-product/manual print/deployed fonts; UI locale distinct from document locale; no print geometry styling change
PRES-C10 Undo/redo/save queue/dirty/history/conflict/preview lifecycle Expected-version/recoverable draft protocol, responsive held-PUT proof PARTIAL Long offline/history and IF-CV-UNSAVED-01 trace; settings history is not immutable historical profile/PDF; profile/job saves remain separate
PRES-C11 Section/document AI improve/translate/instruction/grammar review Deterministic grounding/stale/owner guards, Production no-write HTTP proof DEFERRED 0/366 configured-target calls;0 human semantic reviews;review UI absent. Production503 cv_ai_unavailable/no provider/no write remains; safe withholding is not generation acceptance
PRES-C12 Private PDF/public slug preview-PDF/long searchable output Unchanged 16/36 and8/24 corpora, private/public/admission tests PARTIAL Deployed Linux/font/photo/browser/manual-print qualification and complete revoke/busy-recovery cases; white print pages retained
PRES-M01 Job manual correspondence log/search/delete/paste Timeline/Correspondence composition, correspondence owner tests PARTIAL Full edit/delete/paste/reader native combinations; logging is not sending
PRES-M02 Gmail candidates/thread import/sync/unlink/relink/move Retained job Gmail tools, ownership/import tests PARTIAL Actual provider threads/multi-account revoke/reconnect/sync failures; cross-job changes owner-bound
PRES-M03 Global inbox filters/page/provider/link/direction/detail/attachments Retained inbox route, Email ownership tests PARTIAL Large mailbox/native attachments/complete reader acceptance; global inbox remains Phase7 migration
PRES-M04 Compose/reply/draft revisions/confirmed send/uncertain attempt Retained draft/send owner, draft revision/send tests PARTIAL Sandbox delivery/reconnect/dirty interruption; no automatic uncertain resend; reviewed followMode UI deferred
PRES-M05 Gmail reviewed job/link/reject/keep/notes/sync/create Review alias/native route, review controller/page tests PARTIAL Real provider and complete proposed-job create flow; route opening is no-write
PRES-M06 Gmail/Graph/IMAP connect/status/disconnect Retained Connections, connection/controller tests PARTIAL Real grants/revoke/token expiry/reconnect/IMAP safety; keep sign-in identity separate
PRES-S01 Personal counts/activity/funnel/company/skills/stage/salary/next action Dashboard, implemented Analytics, target correction PARTIAL Exact cohort/timezone/sample/unsupported metrics and whole reader acceptance; no fabricated statistics or Analytics rebuild
PRES-S02 Five owner-local flags/onboarding/bell read-dismiss Dashboard flags, bell, 12 concurrent rounds PARTIAL Historical500 causes unproved; full onboarding/notification acceptance; order/resize/reset/cross-device design remains Phase8
PRES-S03 Rules/notification/table/theme/language/account preferences Settings primitives, Rules retention, P6 feedback PARTIAL Language failure visibility is separate from RD11 server cause; RD12 notification locking/RD13 Rules500 and human/provider acceptance retained
PRES-S04 Privacy/AI usage/limits/server entitlement/billing availability AI protocol/privacy/metering, plan/usage tests PARTIAL Checkout/webhook/portal and provider delivery; temporary C11 withholding cannot disable unrelated AI or imply successful review
PRES-S05 Account ZIP/encrypted backup/lifecycle/deliberate delete Native package/ZIP relationships, release recovery gate PARTIAL Current complete backup/restore/keys/tombstones/rollback and deletion/provider policy; downloading backup is not restore proof
PRES-A01 Admin users/create/roles/reset/delete/last-admin/self guard Retained admin census, Users/authorization tests PARTIAL Mounted-role revoke/full persisted mutations/reset delivery; hiding navigation never authorizes API calls
PRES-A02 Audit detail/supported undo/job restore Retained audit census, audit/authorization tests PARTIAL Native successful persisted undo/restore and unsupported-action denial; no generic undo semantics
PRES-A03 System/build/DB/AI/mail/SMTP/probe/benchmark/maintenance Metadata disclosure, admin route census PARTIAL Actual guarded diagnostic/SMTP/model/maintenance and sensitive-output qualification; no production jobs launched

Routes and critical invariants

The 32-pattern route acceptance records 31 original patterns plus meaningful /analytics, with 192 role/entry-refresh observations and 98 selected API reads in Phase 5. They are behavioral census evidence, not HTTP200-only acceptance and not complete long-tail route certification. Preserve /kanban→Jobs Board, /applications/:id→job workspace, correspondence review aliases, section/sub query priorities, numeric navigation-helper outputs, safe internal from, focusJobId, capture consumption and provider/token routes. No new Documents/Notifications/aggregate Admin route is inferred from an illustrative navigation tree.

Fresh regression must retain account/role/object denial, source/override/sibling isolation, CV expected-version/history/draft recovery, original rendering tolerances, public slug revocation/private export admission, immutable package/source/binary relationships, proposal grounding/invalid-block/stale-state protections and Production withholding. P2-D01 is an ordinary passing test; no skip, expected-failure marker or weaker assertion is acceptable. No Phase 6 presentation change authorizes schema cutover, destructive restore, billing/deletion/provider activation or production release.

Open acceptance and release gates

The complete RD01–RD28 register and successor dispositions remain linked obligations, not erased by passing CV/tenant tests. Human screen-reader work is NOT COMPLETE/NOT VERIFIED; physical touch/software keyboard/mobile AT remain NOT VERIFIED. Axe incomplete nodes and all-enabled findings require contextual triage; finite zoom/emulation/root-overflow checks do not supply spoken-name or device evidence. Production fonts/portraits/alternate browser/print qualification remain open.

Keep language/notification/Rules exception causes, command/dialog focus timing, CV section expansion and Unsaved intermittence, Board full-array scaling, profile/job stale-save and creation idempotency, F20 worker durability, F21 timezones, provider/billing/deletion policy and legacy cutover individually owned. P6 feedback repairs close only their demonstrated UI failure behavior. P5-13, P5-05 and followMode UI remain deferred.

Production remains NO-GO until F04/current complete backup/isolated restore/configuration/schema/secrets/rollback/deployed smoke/monitoring have actual operator evidence and a separate release decision. This reconciliation supplies neither complete human sign-off nor production GO. Phase 7 may only use the conditional migration handoff; no Phase 7 implementation is included.