Planning at 2a2f9e48052c562ef599825458d0d3a6f9f9fc61. None of these gates is closed by writing this document. P4-06 permits planning, not unqualified implementation. Gate IDs below are planning references, not replacements for defect/PRES IDs.
G-SHELL — P5-00, before P5-01 starts
Successor evidence: P5-00 implementation and validation. The five shell defects below are addressed, including the shared 1024px threshold and open-drawer resize lifecycle. The separate P5-00-D01 clock fixture is deterministic and the backend baseline is restored to 916/916. P5-01 has an explicit GO. The following table preserves the original required evidence.
P5-00 is required. Resolve these narrowly against the existing shell first, with regression evidence before regrouping or restyling it. This separates baseline remediation from redesign regressions.
| Existing condition | Bounded prerequisite / responsible owner | Required exit evidence |
|---|---|---|
| P4-06-O01: persisted desktop collapse hides mobile labels and puts first focus under the app bar | AppShell: separate the mobile presentation decision from the saved desktop preference; correct drawer/header focus occlusion using existing MUI mechanics |
Collapse → reload → 320/390px → open drawer: all labels visible, first and last links reachable and hit-testable, focus not obscured; Escape returns to trigger; return to desktop retains collapse. Expanded control and 767/768 boundary also pass |
| P4-06-O02: long synthetic admin version badge overlaps narrow header | Same owner: bounded metadata reflow/disclosure; retain admin-only version and commit access | Admin/non-admin, long name/version, EN/NB, both themes at 320px. No logo/control overlap; no loss of metadata or accidental public exposure. Do not claim actual production badge overlap was proven |
| P4-02-D01: command results render non-list children under a list | QuickCommandDialog: correct list/result and empty-state semantics using native/MUI elements, retain existing callbacks |
Loaded, empty and keyboard result activation; axe list finding absent; Add still opens review without POST, company opens ?edit=id, job opens its exact ID; focus return works. Arrow-key command expansion belongs to P5-02 |
| P4-03-D01: light Redo Tooltip contrast 3.89:1 | Shared theme.ts Tooltip foreground/background pair only |
Actual loaded Redo plus shell/table tooltip in both themes, hover and focus: ordinary text ≥4.5:1; remove only the repaired narrow expected contrast exception after proof. Preserve tooltip naming/focus and other semantic pairs |
| P4-04-O01: fixed toast overlaps bottom actions | toast.tsx/its existing Snackbar placement boundary: smallest placement/reserved-space treatment needed for actionable feedback and underlying actions to remain reachable |
Trigger export toast while Connections is visible at 320/390px and desktop; inspect while toast is open, keyboard/hit-test both actions, dismiss/action callback and return. Waiting 3.5 seconds is not repair. Keep message lifetime/provider/auth ownership; no notification framework |
These five conditions share shell exposure, not one architectural root cause. Implement/review them as small sub-diffs in one readiness checkpoint; do not create a general overlay manager. If toast placement requires broad page architecture, pause that item and report the concrete blocker rather than hiding it in P5-01.
Also extend the existing real-App fixture for collapse, drawer close versus route selection, command/account/notification disposal on account switch, dirty-navigation Cancel/Discard and theme/language changes while editing. Preserve providers and router lifetime. Current router memoization still depends on table page-size/column preferences; do not change those owners in P5-00/01. Characterize their behavior for P5-03 separately.
Exit: focused reproduction now passes, no general axe exclusions, final complete baseline passes with count deltas explained, EN/NB × light/dark shell evidence reviewed, issue statuses updated individually. P2-D01 remains the separately identified expected failure. P5-01 is not cleared at this planning checkpoint. A successful, separately authorized P5-00 checkpoint is its entry gate.
G-JOBS — before table/board consolidation
Current query gate: GO after P5-04b readiness. Both existing endpoints now use one server query and native membership/refresh/ownership evidence passes. P5-04b integration uses that unchanged contract in the shared workspace. Full Board population remains O(N), not one Table page; see the explicit performance ceiling. The paragraphs below preserve the original prerequisite and why the readiness checkpoint was necessary.
Before P5-03, extend PRES-J05/J06 behavioral coverage for saved-view create/select/delete, filtered selection, partial bulk failures, column/page preferences, custom-status URLs, Back/refresh, capture review without writes and 320px actions. Preserve current local Comfortable default; density is neither server-persisted nor a CV setting.
Before P5-04b, prove the actual data contract. JobTable calls paginated /jobapplications with search/company/status/location/readiness/follow-up/sort/deletion filters. KanbanBoard calls /jobapplications/board without those parameters; that API accepts only includeDeleted, returns all matching non-deleted records by default and has its own ordering. Parity does not exist today.
P5-04a can restyle the board at /kanban using its existing data. P5-04b is blocked on a separately reviewed, owner-scoped read contract supporting the same filter population without silently changing the all-record board into one table page. Define completeness, stable ordering, bounded loading/pagination, page-size interpretation and mutation refresh; test more than 25 jobs, unknown statuses, filtered-out moves and partial failures. No browser crawl across every table page, client-only approximation of readiness, or redirect with silently dropped filters. If backend work is required, authorize it separately; no schema or generic query framework is implied. Keep /kanban live until this proof exists. This gate does not delay Dashboard.
G-PACKAGE — native preservation before package/tailoring restructuring
P2-D01 is reproduced SQLite DateTimeOffset ordering failure in ApplicationAssetsService.GetTailoringPlanAsync and SubmittedApplicationPackageService.CaptureAsync. Existing service tests do not prove native success. The browser expected-failure branch is entered only for the observed capture 500; its historical archive checks have not run successfully.
Required separately authorized repair/proof:
- Real disposable API: account, canonical profile, two variants, job, cover letter, answer draft and attachment; tailoring GET and native capture succeed.
- Record package identity/source versions; mutate live CV/profile/letter and delete live attachment. Frozen HTML/letter/answers and exact archived binary stay unchanged and downloadable.
- Cross-owner read/reference/download denied; detach preserves variant; current single-job CV association is not converted into many-to-many. Source-copy failure and retry are explicit, not a successful incomplete package.
- Native restore/readback and backend/provider compatibility tests pass. Remove P2-D01 annotation only after the original failure and post-capture assertions pass; record the intentional browser count transition.
Blocks P5-08b section/application/document restructuring, related CV tailoring changes, and any future global document index. Does not block P5-00–03, P5-04a, existing-data P5-06/07 or P5-08a's bounded header/overview work. No package changes in the shell or dashboard.
G-CV-REV — server revision safety before broad CV migration
F01/audit D01 remains open. Current CvVariantService.SaveAsync(owner,id,name,settings,source,ct) owner-loads and increments Version; it has no expected-revision parameter/comparison. Restore calls Save. The browser queue serializes one mounted editor only. B02 account identity, stale-record conflicts and creation idempotency are three separate contracts.
Missing proof: two independent same-account clients load vN; A saves vN+1; B's stale save/restore cannot overwrite A; deterministic conflict/reload/review handling preserves B's unsaved work; canonical-source edits and variant resets have explicit version semantics; legitimate retry/reload/history/undo succeed. Owner isolation must continue to hold. Relevant job/profile lost-update semantics must be resolved before changing their persistence, not silently rebuilt by a UI slice.
This is separate integrity work, not authorization to start B07 or implement a concurrency framework. Any schema requirement invokes existing restore/rollback readiness first. Serialize all edits to CvBuilderEditor with that work. Blocks P5-09–14. Shell-only route entry and the existing isolated preview keyboard protection can remain in use meanwhile.
G-CV-RENDER — geometry, templates and real output
The renderer is shared, but preview is not a byte-for-byte PDF rendering: CvBuilderEditor.previewDocumentHtml injects page padding, a pagination script and per-page transforms into server HTML. CvCustomizeTab, normalized settings and ThemedCvRenderer also influence layout. P4-03 proved keyboard access, not margin accuracy or document-theme fidelity.
Before P5-09–14, obtain a dedicated rendering checkpoint, with corrections separately authorized if needed:
- Inventory actual saved template IDs/capabilities and supported control combinations. Retain every current template, including Code, plus unsupported-setting normalization and old saved settings.
- Agree expected A4/Letter page geometry, supported margin extremes, header/sidebar/column behavior, section gaps and overflow indications. Compare the same persisted settings/source revision in live preview and actual downloaded PDF, not just page count.
- Render one/long multi-page EN and NB CVs with long headings, section/item hiding, grid/bubbles, columns, photo, dates, page density and template typography. Cover every template at defaults and a risk-based supported-settings matrix; state exclusions explicitly rather than promise every Cartesian combination.
- Record measured margins/page dimensions, text extraction/searchability and images of every compared page; review page breaks, clipping, missing/duplicated text and blank-page/whitespace anomalies. Validate local fonts/Chromium and separately identify deployed renderer differences.
- Exercise preview delay/out-of-order failure/Retry, undo/reload, public versus private PDF and B03 busy/cancel/recovery. Opening tabs or previews must not bypass shared PDF admission.
This is where the reported incorrect margins/templates must be understood and corrected; P5-11's UI migration is not a substitute for that repair. Scope expected output before changing geometry. A major rendering replacement is not implicitly authorized.
Other scoped gates and safe progress
| Gate | Entry condition / scope | Does not block |
|---|---|---|
| G-METRICS | Before P5-06/07: exact source/population/period/sample labels from Phase 3; browser tests for transformations, all five owner visibility flags and error vs zero. P5-06 evidence supplies the Dashboard presentation proof; P5-07 must revalidate the destination it changes | Shell, Jobs |
| G-WORKSPACE | Before P5-08a: reproduce/protect mobile progress-scroll accessibility. Before 08b: section/query/followMode retention, draft/AI review guards and all legacy mappings; G-PACKAGE also required |
Table, independent charts |
| G-CV-BEHAVIOR | Before each CV slice: source/reset/item override, browser history restore, reorder alternatives, save failure and AI accept/reject regression required by its PRES rows, in addition to G-CV-REV/RENDER | Non-editor pages; planning/fixture specification may proceed |
| G-RELEASE | F04 deployed peer/listeners/ports/firewall/NAT/IPv6/DNS/TLS/restarts; production CI/browser runner, providers, backup/restore/rollback and relevant billing/configuration evidence | Local feature-branch UI planning/testing; never grants production approval |
Career Profile, CV library, full Documents/Notifications, mail, Settings and Admin page migrations remain Phase 7. New dashboard layout customization remains Phase 8. No global document/AI/admin/notification producer is invented to complete navigation. If CV gates remain open, finish independent representative slices and report partial/conditional Phase 5 acceptance with CV explicitly deferred; do not claim the full representative set was implemented.