Files
jobtrackingapp/docs/direct-roadmap/OWNER_DECISIONS.md
T

25 lines
2.9 KiB
Markdown

# Owner decisions
10 November 2026. The [roadmap TODO](ROADMAP_TODO.md) tracks current work and protected decisions. This record is for direct execution in chat.
## D01 — P10-01 / CLEAN-20
**APPROVED AND EXECUTED.** The owner replied “Approve CLEAN-20 only”. The approval covered the 38-line unimported `job-tracker-ui/src/App.css` at blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Verification and publication are in [P10-01](../redesign/phase-10/P10-01.md). Another removal needs its own evidence and approval.
## A3 implementation and final visual review
The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision.
## Later decisions — not requested prematurely
The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted.
| Decision | Options and recommendation | Work held |
| --- | --- | --- |
| Homepage concept selection | Review the four published directions at `ccb11494`. Select or combine elements, then review the refined design. Keep product and pricing claims under their own review. | LAUNCH-02 refinement and later public implementation |
| MFA recovery and private support access | Review the separate technical proposals on the security branch. Prefer user-controlled recovery and explicit, scoped, revocable support consent. Retain present access while decisions are pending. | Factor reset/change workflow and cross-owner private support access |
| Global Jobs entry and rights | Review the accepted predecessor reports and provider rights before approving country/provider scope. Defer capabilities without documented access. | GJ-01 onward and provider activation |
| Isolated diagnostics and recovery rehearsal | Approve a specific disposable target, fixtures and operational acceptance criteria once the plan is ready. Retain production separation. | Real rollback, restore and diagnostic execution |
| Performance infrastructure | Keep the current topology while measurement is incomplete. Compare isolated replica, CDN and pool experiments only against a measured capacity or latency need. | Any external service, paid plan, DNS or production topology change |
| Final qualification | Review the source-bound A3, Phase 10, locale, security and release packages independently at their required gates. | Final milestone and production release decisions |