Files
jobtrackingapp/docs/work-programmes/session-handoff.md
T
cesnimda fb7240f2ff
CI and Deploy / test (pull_request) Successful in 4m22s
CI and Deploy / deploy (pull_request) Has been skipped
docs(email): record draft export evidence
2026-08-10 10:01:48 +02:00

19 lines
3.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# JobTracker session handoff
Updated: 2026-08-10
- **Exact current task:** MAIL-001 — design and implement the bounded authenticated draft API over the now-exportable tenant-owned store; do not wire UI until API isolation/concurrency tests pass.
- **Last completed step:** complete readable draft coverage for encrypted on-demand and hashed per-owner daily exports was committed/pushed as `2fa4e38`; focused 4/4 and backend 625/625 pass.
- **Files currently modified:** authoritative MAIL-001 tracking/evidence only; persistence/export code is committed.
- **Commands already run:** dependency/audit/router/full frontend/build; legacy follow-up/export/recovery/provider suites; full backend; Gitea run inspection; Playwright; MAIL context/unlink/provider-state/Free-policy/draft-persistence focused and full suites/build; EF model-current and dual-provider up/down scripts. See V-126V-146.
- **Test results:** npm audit 0 vulnerabilities; Gitea pull-request CI PASS in 4m20s at run 609; backend 625/625; frontend 50/50 suites and 194/194 tests; Playwright 4/4; production build passes. Draft isolation/cascade 1/1; EF model current; SQLite/MariaDB draft up/down scripts pass. Full blank-chain SQLite apply fails earlier in `AddJobEntityAndProspectStages` on missing `LastReminderEmailSentAt` (JT-019).
- **Services currently running:** none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- **Temporary files or processes:** no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- **Production changes currently active:** none. No deployment, migration, provider connection/sync/send or production payload occurred.
- **Rollback status:** downgrade `20260810075206_AddEmailDrafts` before reverting `14b396a`; then follow the existing MAIL rollback order (`ee5ef7e`, `449faeb`, `123fc55`/`e9937ac`, ledger downgrade before `653f011`). No production migration/deploy/provider grant occurred.
- **Uncommitted changes:** tracking/evidence for `2fa4e38` and V-147 only; commit and push before the draft API increment.
- **Known failures:** live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- **Exact next action:** add authenticated list/get/create/update/delete draft endpoints with owned-job validation, bounded plain-text fields, revision conflict handling and two-user direct-ID tests. Keep content out of logs, notifications and browser storage; no provider call or send occurs on save.
- **Work that can continue independently:** remaining MAIL-001 repository work and later UX packages. SEC-006/007 await package-index permission; PROD-001/003/004 await production access.
- **Decisions still required from the user:** none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.