Files
jobtrackingapp/docs/direct-roadmap/ROADMAP_STATUS.md
T

6.8 KiB
Raw Blame History

Direct roadmap status

Updated 11 November 2026. This register records direct-chat work. See the continuation checkpoint for exact integration refs and evidence.

Workstream/checkpoint Status Dependency and evidence
PHASE-10 / P10-00 assessment COMPLETED Report in ../redesign/phase-10/P10-00.md; assessment 7ba1367, publication receipts 8cdff28/1692142. Remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 on 2 November
P10-01 / CLEAN-20 VALIDATED AND PUBLISHED Owner approved only the unused App.css removal. Source and receipt at 78f7396a. See P10-01
P10-02 CV/documents REVIEWED, RETAIN Historical document and import compatibility kept. See P10-02
P10-03 backend/dependencies/config REVIEWED, RETAIN No additional proven-safe removal. See P10-03
P10-04 candidate functional/data verification QUALIFIED WITH INHERITED LIMITS Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward
P10-05 full acceptance READY FOR OWNER REVIEW Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at 59fd674f. D02 final milestone decision pending. See proposal
PRODUCT-REVIEW-01 FINAL REVIEW BLOCKED Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation
A3 UI/UX modernisation IM10 IN PROGRESS Published through9f341750, final source99b144f4. Combined76 affected cases/seven suites, build/lint and Rules12 configurations/84 scans passed. Export/native/count matrices keep their recorded sources. V45–V47 resolved; other workflows/native/human/final Gate F open
INT-GLOBAL-JOBS-01 / GJ-00 CONDITIONAL Existing planning at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; exact remote reverified 2 November. No implementation authorised
INT-GLOBAL-JOBS-01 implementation BLOCKED Accepted Phase 10/Product Review, initiative approval and provider rights
I18N-01 / I18N-00 audit PARTIAL All 188 historical dynamic call reviews accounted for in published 4172c23d. Full visible-text, native, market and European coverage remain open
I18N-01–08 implementation/acceptance PARTIAL Shared MUI/picker EN/NB defaults published through A3 e6240ad3. Live controls/drafts/theme verified in finite paired configurations. Legacy timestamp precision, broader visible-text/native review and additional locale publication remain open
LAUNCH-SITE-01 / LAUNCH-00 audit PARTIAL Design-neutral contracts at af8c48ce and rendered baseline reconciliation at 98483b80. Design research, asset rights and public claims remain open
LAUNCH-01 four desktop/mobile concepts PUBLISHED FOR REVIEW Gallery and eight rendered screenshots at ccb11494. 20 controlled browser checks passed
LAUNCH-SITE final design/implementation AWAITING_APPROVAL Owner selection or combination is next. Refine and obtain final design approval before application implementation
SECURITY-AUDIT-01 OFFLINE PREFLIGHT PARTIAL Approved root policy published at de3d5031. Formal integrated scan requires a completed application baseline and applicable environment/cost approval
RELEASE-READINESS-01 / discovery and RR-11–14 PARTIAL Release branche1c8e845 explicitly propagates prune/enumeration failures.16 backup and6 rollback offline methods plus syntax passed; root verified diff/ref/source receipts. Earlier parser/guards/probes retained. Real rollback/restore/off-host/release qualification remain open
Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance BLOCKED Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence
PERF-01 / 18 performance areas IN PROGRESS A3 page query, Companies cache, rules freshness and locale request changes published through 1d733675. JobTable split trial remains isolated after a throttled phone regression. MariaDB plan/load validation blocked by unavailable local Docker engine

Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See blockers, owner decisions, completed work and next actions.

11 November flat Edit Job continuation

  • A3 published and remotely read back at c172427fb21820084eb0b029178599c1f776edac. Presentation 7bfebe88 removes four decorative Edit Job panels and the raised intro; verifier 552525df adds tablet coverage. All fields, actions and revision/date payload contracts retained.
  • PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md.
  • V39 resolved within /jobs; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.

EN/NB import/conversion singular feedback qualified through511b68a1:50 overlapping cases, two paired profiles/six native conversions/six scans. Broader localisation and native-language review remain open.

11 November continuation: A3dbae1962 integrates submitted-CV revision integrity (22 scoped backend cases; legacy0 retained). Release4019569a closes mocked permission failure propagation (19 backup methods). Frontend76-case and UI matrices remain historical/source-bound; no new app-wide acceptance. Delegate quota and C-capacity limits documented; E build lane works.

Latest canonical-profile package follow-up integrated/publishedcef45404, source2cd561d7;26 backend cases/noskips, source/native identity verified. This extends the earlier CV revision guard; it does not accept full document workflows, atomicity, security or release. Frontend76 and prior visual evidence remain historical.

Environment continuation: final integration graph refresh FAILED/no C space. Valid isolated graph2488 files preserved/hash-verified on E; C approximately65MB free. Application/tests/evidence published; delegate quota/context/resource handoff does not mean roadmap complete or all tasks blocked.