docs: reconcile A3 audit and already integrated CV journey

This commit is contained in:
cesnimda
2026-11-18 19:45:27 +01:00
parent b4e5fea2e5
commit 09a3a6642b
3 changed files with 17 additions and 0 deletions
+7
View File
@@ -1,5 +1,12 @@
# Direct execution continuation
## Redesign continuation and CV recovery reconciliation
A3 assessment5fd5c470452ae78ab46e74b7c1d8fb4336a7484d published/refverified on codex/a3-ui-10. Verdict PARTIALLY IMPLEMENTED; all34routes/57groups reconciled from records, no fresh route-wide screenshots or final owner acceptance. Report docs/ui-modernisation/reassessment/A3_ASSESSMENT.md. Available audit worker reassigned to five new interactive prototypes in isolated E:/Storage/Projects/Active/temp docs/jobjakt-local-build/design-reassessment; original designs preserved. Current public official research started (Linear March2026 refresh/docs, Teal tracker/help, Huntr help); no authenticated product walkthrough claimed.
CORRECTION to prior CV checkpoint: a88e260d3983ae5afec55a13f9af5db264b1cb2b already contains the93-line connected CV test and is ancestor of2c5d0451. Preserved career-cv-journey draft differs only in its pending-qualification comment. Guarded transfer failed because target already has implementation, not a missing/incompatible feature. recovered-cv-connected.json records actual focused test PASS1/1,0skip/flaky/unexpected,21.36seconds on existing E browser backend. Do not duplicate implementation or claim full library regression from this run. Prior note claiming this invocation cannot qualify proposed test was incorrect; native report names the exact connected profile/selected-CV/edit/preview/PDF case. Artifact packaging and reconciliation with earlier a88 acceptance remains next root task.
## Full design reassessment authorised
Owner directive archived in DESIGN_REASSESSMENT_DIRECTIVE.md; SHA256 5b7fc4f837569f01286ba57fa07954d6fafae716611a3898387c595314a72de5. Exploration is released from A3 visual/navigation constraints. Five NEW distinct clickable concepts are requested; preserve original A3 prototypes and all functionality. No replacement implementation until explicit selected-direction AND strategy approval. A3 final visual acceptance remains absent. Separate statuses: existing A3 audit ACTIVE; new research/prototypes PENDING; new owner approval PENDING; replacement implementation NOT AUTHORISED; wider roadmap CONTINUES. All24 EU/all60 planned locale scope retained. Deprioritise discretionary A3 cosmetics; continue integrity/accessibility/business logic/performance and other eligible work.
+7
View File
@@ -1,5 +1,12 @@
# Direct roadmap status
## Redesign continuation and CV recovery reconciliation
A3 assessment5fd5c470452ae78ab46e74b7c1d8fb4336a7484d published/refverified on codex/a3-ui-10. Verdict PARTIALLY IMPLEMENTED; all34routes/57groups reconciled from records, no fresh route-wide screenshots or final owner acceptance. Report docs/ui-modernisation/reassessment/A3_ASSESSMENT.md. Available audit worker reassigned to five new interactive prototypes in isolated E:/Storage/Projects/Active/temp docs/jobjakt-local-build/design-reassessment; original designs preserved. Current public official research started (Linear March2026 refresh/docs, Teal tracker/help, Huntr help); no authenticated product walkthrough claimed.
CORRECTION to prior CV checkpoint: a88e260d3983ae5afec55a13f9af5db264b1cb2b already contains the93-line connected CV test and is ancestor of2c5d0451. Preserved career-cv-journey draft differs only in its pending-qualification comment. Guarded transfer failed because target already has implementation, not a missing/incompatible feature. recovered-cv-connected.json records actual focused test PASS1/1,0skip/flaky/unexpected,21.36seconds on existing E browser backend. Do not duplicate implementation or claim full library regression from this run. Prior note claiming this invocation cannot qualify proposed test was incorrect; native report names the exact connected profile/selected-CV/edit/preview/PDF case. Artifact packaging and reconciliation with earlier a88 acceptance remains next root task.
## Full design reassessment authorised
Owner directive archived in DESIGN_REASSESSMENT_DIRECTIVE.md; SHA256 5b7fc4f837569f01286ba57fa07954d6fafae716611a3898387c595314a72de5. Exploration is released from A3 visual/navigation constraints. Five NEW distinct clickable concepts are requested; preserve original A3 prototypes and all functionality. No replacement implementation until explicit selected-direction AND strategy approval. A3 final visual acceptance remains absent. Separate statuses: existing A3 audit ACTIVE; new research/prototypes PENDING; new owner approval PENDING; replacement implementation NOT AUTHORISED; wider roadmap CONTINUES. All24 EU/all60 planned locale scope retained. Deprioritise discretionary A3 cosmetics; continue integrity/accessibility/business logic/performance and other eligible work.
+3
View File
@@ -286,3 +286,6 @@ Next integrity investigation:AttachmentStorage snapshot cleanup ownership (sourc
- [ ] Compare existing-component redesign,major frontend restructure,and new API-backed frontend; preserve functionality/data/routes.
- [ ] Present consolidated concept/strategy review; explicit owner approval required before replacement implementation.
- [ ] Continue wider authorised roadmap and recovered CV journey while design exploration proceeds.
- [x] **A3 record-based reassessment**.5fd5c470 published/refverified; PARTIALLY IMPLEMENTED,34routes/57groups reviewed. Fresh rendered matrix and final owner acceptance still open.
- [x] **Recovered CV proposal identity**.Already integrated a88e260d; preserved draft comment-only difference. Latest focused native1/1 passed; no duplicate implementation needed. Evidence packaging/full-library source qualification remain separate.