@@ -89,8 +89,8 @@ Files: new `p5-15-06/README.md` and validation evidence; parent acceptance/57-gr
Files: `docs/redesign/phase-6/README.md`, using `docs/redesign/IMPLEMENTATION_PLAN.md`.
- [] If severe blockers no longer prevent a scoped transition, record accepted baseline, deferred scope, manual/production gaps, design review checkpoints and Phase 7 dependencies.
- [] Commit/push preparation, verify remote=HEAD/clean tree/main unchanged; do not begin Phase 7 migration.
- [x] If severe blockers no longer prevent a scoped transition, record accepted baseline, deferred scope, manual/production gaps, design review checkpoints and Phase 7 dependencies.
- [x] Commit/push preparation, verify remote=HEAD/clean tree/main unchanged; do not begin Phase 7 migration.
## Evidence ownership
@@ -100,4 +100,4 @@ Completed commits and command results are recorded in each successor report and
## Executed successor
Steps1–6 complete for safe available scope with independently pushed units and [final evidence](p5-15-06/README.md). This checklist marks investigation/reporting completion, not missing operator gates as passed: implemented scope CONDITIONAL GO, original scope NOT COMPLETE, production NO-GO. Human-reader work is postponed/NOT COMPLETE, physical devices and deployed Linux/fonts/recovery evidence unavailable. P5-13 remains deferred/unqualified/withheld. Phase6 preparation is the remaining independent planning unit.
Steps1–7 complete for safe available scope with independently pushed units and [final evidence](p5-15-06/README.md), baseline `9528504866054da10e20d5196e65de536c4c9499`. This checklist marks investigation/reporting completion, not missing operator gates as passed: implemented scope CONDITIONAL GO, original scope NOT COMPLETE, production NO-GO. Human-reader work is postponed/NOT COMPLETE, physical devices and deployed Linux/fonts/recovery evidence unavailable. P5-13 remains deferred/unqualified/withheld. [Phase6 preparation](../../phase-6/README.md) carries all obligations; next execution checkpoint is P6-01 review, not Phase7 migration.
@@ -6,6 +6,8 @@ The owner's latest instruction authorises continuous bounded repairs and indepen
**Implemented scope: CONDITIONAL GO for Phase 6 review planning. Full originally planned Phase 5: NOT COMPLETE. Production: NO-GO.** Fresh312axe scans retain39all-enabled violation-node occurrences and2,367incomplete occurrences; automated success is not full accessibility acceptance. [Targeted debt disposition](p5-15-04/DEBT_DISPOSITION.md) retains contextual rule warnings, historical preference500 causes, the CV Unsaved incident and O(N) Board capacity. Twelve concurrent preference rounds and exact200/1,000-job Board membership pass locally without closing those production/manual obligations. [Commit ledger](p5-15-06/COMMITS.md) records independently pushed units; no production action follows.
[Phase6 review planning](../../phase-6/README.md) now uses final acceptance baseline `9528504866054da10e20d5196e65de536c4c9499`, retaining conditional implemented scope, original scope NOT COMPLETE and production NO-GO. Next review checkpoint: P6-01. No Phase7 migration or P5-13 activation begins.
The 57-group matrix now records **0 PASS / 56 PARTIAL / 0 FAIL / 1 DEFERRED =57**. Whole-group acceptance remains incomplete. Postponed human screen-reader acceptance is **NOT COMPLETE / NOT VERIFIED**; physical devices/software keyboards, incomplete axe triage and deployed font/portrait qualification remain open. P5-13 remains deferred/unqualified/Production-withheld, 0/366 calls, no human semantic review or review UI. P5-05 and followMode reviewed compose remain explicitly deferred.
[Production assessment](p5-15-05/README.md): **NO-GO**, main unchanged. F04, current complete backup/isolated restore, deployed configuration/schema/secrets, rollback and smoke/monitoring evidence are still required. Phase 6 planning does not waive them or declare the original full Phase 5 scope complete.
The P5-15-06 evidence commit is created/pushed after this ledger; its actual hash is recorded in the Phase6 handoff and final response, avoiding a self-referential fabricated hash. The subsequent Phase6 planning commit is also reported after creation. Focused before/after evidence is in each repair record; full post-change commands/times/hashes and limits are in evidence/validation.json. No production CI/deployed smoke, human acceptance or configured-model qualification is claimed.
Final P5-15-06 evidence commit: **`9528504866054da10e20d5196e65de536c4c9499`**, pushed with remote=HEAD and clean tree; main unchanged. The [Phase6 planning](../../../phase-6/README.md) commit is reported after creation rather than inventing its own self-referential hash. Focused before/after evidence is in each repair record; full post-change commands/times/hashes and limits are in evidence/validation.json. No production CI/deployed smoke, human acceptance or configured-model qualification is claimed.
**Review-planning readiness: CONDITIONAL GO.** Phase 5's implemented local scope can enter bounded design/UX review; the originally planned full scope is NOT COMPLETE and production release remains NO-GO. This is the transition/planning checkpoint, not Phase 7 migration or a release authorization.
## Verified handoff
Phase 5 final acceptance baseline: **`9528504866054da10e20d5196e65de536c4c9499`**, development `codex/ui-redesign-phase4`, committed/pushed with remote=HEAD and a clean tree. Final application change: `22455bba0a016f0cefabde46c539df588f789667`. Production local/remote `main` remains **`27657f31131cd95d42f0e1290853ec9c9b3959a4`**; a main push triggers deployment and is prohibited while NO-GO.
Authority: [original Implementation Plan](../IMPLEMENTATION_PLAN.md), [Phase 5 plan](../phase-5/PHASE5_PLAN.md), [final acceptance](../phase-5/p5-15/p5-15-06/README.md), [57 original-group reconciliation](../phase-5/p5-15/PRESERVATION_ACCEPTANCE.md), [32 routes](../phase-5/p5-15/ROUTE_ACCEPTANCE.md), [pushed-unit ledger](../phase-5/p5-15/p5-15-06/COMMITS.md), [remaining findings](../phase-5/p5-15/p5-15-04/DEBT_DISPOSITION.md) and [production gate](../phase-5/p5-15/p5-15-05/README.md). Historical failures and incomplete acceptance are retained.
Counts are separate lanes/subsets, not summed into a fictional total. Final ordinary/native runs have zero skips, expected failures, flaky results or retries. P2-D01 is ordinary passing. This planning-only change does not claim another full runtime run; document/link/secret/whitespace validation is performed for the handoff.
## Accepted implementation boundary
Shell/navigation and utilities, Jobs Table/Board, Dashboard/Analytics, Job header/Overview/deeper sections, CV frame/navigation, section editing/source clarity, preview chrome, template/document controls and scoped responsive CV workflow have representative implemented/native evidence. All original routes/capabilities remain; later visual migration is not represented as a removed workflow.
Five new audit barriers were repaired independently: keyboard-native file selection, hidden-initial preview measurement, drawer focus/return, CV-to-Career navigation and report target sizes. Two P1s and three P2s are no longer demonstrated failures on their tested paths. No PDF geometry, API status, ownership, source/override/history, submitted package or provider semantics were changed for appearance.
The transition is conditional because whole-workflow/human/device/deployed acceptance is incomplete. It authorizes review planning and finite inspection of implemented scope, not certification of every capability. A newly demonstrated critical security/data or severe accessibility failure requires containment and a separate bounded repair before dependent work; it must not be dismissed as design preference.
## Deferred scope and unresolved acceptance
- **P5-13 remains DEFERRED / UNQUALIFIED / Production-withheld.** Actual deployed model/runtime identity, reachable inference, unchanged366 calls, independent human semantic review, AI review UI and final integration remain outstanding. Zero configured-target calls/zero human reviews; frozen corpus and deterministic authoritative grounding/stale/tenant guards retained. Production service registration remains withheld; no automatic activation. Existing unrelated AI is retained.
- Production hardware is owner-reported Ubuntu24.04/GTX1060 6GB/32GB RAM, distinct from Windows/RTX3080 development. `qwen3.5:4b-q4_K_M` is only a candidate. No actual driver/runtime/offload/throughput qualification or Docker recovery was performed. Separate approved feasibility/qualification work must precede target selection and activation.
- **Human reader acceptance: NOT COMPLETE / NOT VERIFIED.** Owner postponed available-operator work; no actual reader/version/device/spoken results supplied. Physical touch, native dragging, software keyboard and mobile AT also remain unverified. [M01–M13 operator packet](../phase-5/p5-15/p5-15-02/MANUAL_ACCEPTANCE.md) remains mandatory.
- Fresh312axe scans retain39all-enabled violation-node occurrences and2,367incomplete occurrences. Contrast/meaningful initials, heading/landmark structure, drawer AX names, panel associations and broader reflow require contextual disposition; no zero-violation compliance claim. Actual Chromium100/200/400 zoom and emulator input are finite evidence only.
- Production Linux font/portrait/asset qualification remains open despite passing local16/8 corpora and four tiny synthetic photo exports. Do not widen tolerances or infer production metric equivalence.
- Historical preference500/notification contention causes remain open: twelve native concurrent rounds pass but do not diagnose the old exceptions or clear swallowed language-save errors. CV Unsaved incident remains open; the800ms test boundary is qualified, historical trace absent. Other readiness rows retain their own status/owner.
- Board200/1,000 exact membership passes locally (render1,040/1,612ms), but O(N) full-array capacity and physical dragging remain unqualified. No supported-load/memory/latency budget exists yet.
- P5-05 quick preview and `followMode` reviewed compose UI remain explicitly deferred; full Job entry and compatibility query/state round-trip retained. No fake AI/compose/preview screen is included in acceptance.
- F04, current complete backup/isolated restore, actual configuration/schema/secrets, rollback and deployed smoke/monitoring remain release blockers. No production network/service/data change was performed. Prepared operator commands are not verification.
The [complete readiness register](../phase-5/p5-15/READINESS_DEBT.md) retains other provider, domain concurrency, company-dialog error, worker, deletion/billing and cutover obligations. Phase 6 does not erase them or start B07.
## Objectives and reusable foundations
Use the original Phase 6 scope: consistency, usability, information density, light/dark quality, responsive behavior, Norwegian localisation, existing AI patterns, component reuse and performance before broad rollout. Review actual implemented workflows and representative empty/loading/error/conflict states, not idealized screenshots.
Reuse [Phase 4 foundations](../phase-4/README.md): semantic theme/focus/status colors, typography/spacing, named modal controls, deliberate preview entry/exit, PageLayout/section primitives and Comfortable/Compact table density. Existing MUI controls, shell, Jobs query state, Job workspace sections and CV chrome are the starting point. Add no second saving/undo/navigation/renderer system and no new framework for stylistic preference.
The rendered document is a separate physical contract from application chrome. Any review-driven change touching CV preview/template/layout must keep both unchanged fidelity suites and revision/override/frozen-package evidence green; ordinary UI reflow must not alter printed geometry.
| **P6-00 — Handoff and review programme** | This record; verified final Phase5 baseline and scope rulings | Accurate baseline, complete deferred/manual/release obligations and review order | Planning-only documentation commit/push; no release/migration |
| **P6-01 — System consistency and workflow review** | Next execution checkpoint: implemented shell, Jobs, Dashboard/Analytics, Job and CV surfaces | Representative route/state/locale/theme comparison; hierarchy/density/control/action consistency, duplicate/dead affordances; prioritized findings tied to PRES and existing tokens | Review first; any correction gets reproduction, focused regression and independent small commit/push. No broad redesign |
| **P6-02 — Usability and information density** | P6-01 findings and existing product capabilities | Complete task journeys, progressive disclosure, navigation/orientation, long-data and source-scope clarity; no feature removal or persistence change | Product/design owner; record actual user/manual evidence separately from agent review |
| **P6-03 — Locale/theme/accessibility closure** | Fresh triage and M01–M13 packet | EN/Bokmål labels, meaningful contrast, settled drawer names, headings/panels, enabled-action reflow; real reader/device/software-keyboard outcomes before complete acceptance | Qualified human/device operators; unavailable checks stay NOT VERIFIED. Bounded severe-barrier fixes before dependent rollout |
| **P6-04 — Reuse, capacity and rendering environment** | Existing components, finite Board and16/8 rendering baselines | Agreed performance/account/device envelope, measured CPU/memory/query/render cost; production-equivalent font/portrait tests; avoid duplicate components | Platform/CV/operator. Any virtualization/renderer change needs its own compatible design and membership/fidelity regressions; no speculative migration |
| **P6-05 — Existing AI interaction review** | Currently approved/operational AI only | Scope/provenance/review/failure conventions and minimum-context privacy; retain account/provider/Production-withholding guards | Deferred P5-13 is visibly excluded, not completed. No model calls, invented UI or activation from a consistency review |
| **P6-06 — Review acceptance and Phase7 handoff** | Prior findings/remediation and required evidence reconciled | Fresh affected/full regressions,57groups/32routes, three separate scope/full/production decisions, unresolved work and migration order | Phase7 starts only after a separate reviewed handoff; production GO is an independent operator/release decision |
Manual/operator work may run alongside independent review; unavailable evidence does not repeatedly halt unrelated inspection. It cannot be impersonated by an agent or silently converted into PASS. Preserve independently reviewable commits and immediate remote synchronization; never force-push or touch main without a separately verified authorized release decision.
## What Phase 7 inherits
Phase7 will inherit the verified representative design language, original preservation/route inventory, compatible shared foundations, measured document renderer, test fixtures and unresolved gates. The original full-migration list still includes remaining authentication/onboarding/Career/library/Documents/application/mail/Notifications/Settings/Admin/error/dialog states. Already migrated representative Analytics/Settings portions are retained; remaining coverage must be reconciled explicitly rather than rebuilt or assumed complete.
Before that migration: resolve system-level findings with bounded proof, complete required reader/device/rendering acceptance or keep accurately scoped conditional decisions, and retain all production prerequisites. No Phase7 implementation, B07, P5-13 return work or deployment begins in this planning checkpoint.
"runtime":"Inherited from the fresh final Phase5 manifest; no new runtime-suite claim for this planning-only change",
"manual":"NOT COMPLETE; owner-postponed screen-reader and unavailable physical-device/deployed gates retained"
}