docs(redesign): prepare conditional Phase 6 design and UX review

This commit is contained in:
cesnimda
2026-10-10 22:46:28 +02:00
parent 9528504866
commit 3d9341e70f
5 changed files with 157 additions and 4 deletions
@@ -89,8 +89,8 @@ Files: new `p5-15-06/README.md` and validation evidence; parent acceptance/57-gr
Files: `docs/redesign/phase-6/README.md`, using `docs/redesign/IMPLEMENTATION_PLAN.md`.
- [ ] If severe blockers no longer prevent a scoped transition, record accepted baseline, deferred scope, manual/production gaps, design review checkpoints and Phase 7 dependencies.
- [ ] Commit/push preparation, verify remote=HEAD/clean tree/main unchanged; do not begin Phase 7 migration.
- [x] If severe blockers no longer prevent a scoped transition, record accepted baseline, deferred scope, manual/production gaps, design review checkpoints and Phase 7 dependencies.
- [x] Commit/push preparation, verify remote=HEAD/clean tree/main unchanged; do not begin Phase 7 migration.
## Evidence ownership
@@ -100,4 +100,4 @@ Completed commits and command results are recorded in each successor report and
## Executed successor
Steps1–6 complete for safe available scope with independently pushed units and [final evidence](p5-15-06/README.md). This checklist marks investigation/reporting completion, not missing operator gates as passed: implemented scope CONDITIONAL GO, original scope NOT COMPLETE, production NO-GO. Human-reader work is postponed/NOT COMPLETE, physical devices and deployed Linux/fonts/recovery evidence unavailable. P5-13 remains deferred/unqualified/withheld. Phase6 preparation is the remaining independent planning unit.
Steps1–7 complete for safe available scope with independently pushed units and [final evidence](p5-15-06/README.md), baseline `9528504866054da10e20d5196e65de536c4c9499`. This checklist marks investigation/reporting completion, not missing operator gates as passed: implemented scope CONDITIONAL GO, original scope NOT COMPLETE, production NO-GO. Human-reader work is postponed/NOT COMPLETE, physical devices and deployed Linux/fonts/recovery evidence unavailable. P5-13 remains deferred/unqualified/withheld. [Phase6 preparation](../../phase-6/README.md) carries all obligations; next execution checkpoint is P6-01 review, not Phase7 migration.
+2
View File
@@ -6,6 +6,8 @@ The owner's latest instruction authorises continuous bounded repairs and indepen
**Implemented scope: CONDITIONAL GO for Phase 6 review planning. Full originally planned Phase 5: NOT COMPLETE. Production: NO-GO.** Fresh312axe scans retain39all-enabled violation-node occurrences and2,367incomplete occurrences; automated success is not full accessibility acceptance. [Targeted debt disposition](p5-15-04/DEBT_DISPOSITION.md) retains contextual rule warnings, historical preference500 causes, the CV Unsaved incident and O(N) Board capacity. Twelve concurrent preference rounds and exact200/1,000-job Board membership pass locally without closing those production/manual obligations. [Commit ledger](p5-15-06/COMMITS.md) records independently pushed units; no production action follows.
[Phase6 review planning](../../phase-6/README.md) now uses final acceptance baseline `9528504866054da10e20d5196e65de536c4c9499`, retaining conditional implemented scope, original scope NOT COMPLETE and production NO-GO. Next review checkpoint: P6-01. No Phase7 migration or P5-13 activation begins.
The 57-group matrix now records **0 PASS / 56 PARTIAL / 0 FAIL / 1 DEFERRED =57**. Whole-group acceptance remains incomplete. Postponed human screen-reader acceptance is **NOT COMPLETE / NOT VERIFIED**; physical devices/software keyboards, incomplete axe triage and deployed font/portrait qualification remain open. P5-13 remains deferred/unqualified/Production-withheld, 0/366 calls, no human semantic review or review UI. P5-05 and followMode reviewed compose remain explicitly deferred.
[Production assessment](p5-15-05/README.md): **NO-GO**, main unchanged. F04, current complete backup/isolated restore, deployed configuration/schema/secrets, rollback and smoke/monitoring evidence are still required. Phase 6 planning does not waive them or declare the original full Phase 5 scope complete.
@@ -23,4 +23,4 @@ Development branch `codex/ui-redesign-phase4`; no force pushes. Each completed u
| `eba7ad19c6f60d08528ae357db33a56e6fe05f9c` | docs(acceptance): record final native export and photo readback |
| `227e3b4a22a17d92ce59f74e69001df292e379fd` | test(acceptance): qualify preference concurrency and Board membership |
The P5-15-06 evidence commit is created/pushed after this ledger; its actual hash is recorded in the Phase6 handoff and final response, avoiding a self-referential fabricated hash. The subsequent Phase6 planning commit is also reported after creation. Focused before/after evidence is in each repair record; full post-change commands/times/hashes and limits are in evidence/validation.json. No production CI/deployed smoke, human acceptance or configured-model qualification is claimed.
Final P5-15-06 evidence commit: **`9528504866054da10e20d5196e65de536c4c9499`**, pushed with remote=HEAD and clean tree; main unchanged. The [Phase6 planning](../../../phase-6/README.md) commit is reported after creation rather than inventing its own self-referential hash. Focused before/after evidence is in each repair record; full post-change commands/times/hashes and limits are in evidence/validation.json. No production CI/deployed smoke, human acceptance or configured-model qualification is claimed.