# Direct execution continuation
|
||||
|
||||
**P10-05 full local backend lane passed at source `39aac4f404cc19bead83b719fbf372de87f965ff`.** 1,448 passed, zero failed or skipped, Release build and pinned SDK 9.0.317. Native receipt and scope in [P10-05](../redesign/phase-10/P10-05.md). The live AI/corpus lane was excluded. The full frontend suite was started separately on the same unchanged product source. Its native report is pending at this checkpoint. Phase 10 acceptance and independent audit remain open.
|
||||
**P10-05 full local backend and frontend lanes passed at source `39aac4f404cc19bead83b719fbf372de87f965ff`.** Backend passed 1,448 of 1,448 in Release with pinned SDK 9.0.317. Frontend passed 1,031 of 1,031 across 112 suites. Both native runs exited 0. Exact native receipts and scope in [P10-05](../redesign/phase-10/P10-05.md). Live AI/corpus, device/human, hosted and recovery qualification remain separate. Phase 10 acceptance and independent audit remain open.
|
||||
|
||||
**Published A3-IM10 checkpoint `71c927b15bdea7c41d76dee084baf05af6f703cd`**, independently matched on `codex/a3-ui-10`. Runtime `c7e8627ca782b37ed553299a1db93af192e420e4` removes duplicate headings across four Admin routes. 66 targeted Jest tests, type-checking, lint, build, 36 controlled configurations and 324 browser captures/axe scans passed. No writes, export requests, page errors or axe violations. The 144 intentional System 503s and 216 unavailable company reads are recorded separately. 1,472 committed/source/export checks passed. See `ADMIN_HEADINGS_REVIEW.md`. The 768 px Bokmål audit screenshot exposed separate timestamp wrapping, tracked as V25. Remaining Admin action/error/permission states are open.
|
||||
|
||||
|
||||
@@ -9,7 +9,7 @@ Updated 9 November 2026. This register records direct-chat work. See [the contin
|
||||
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) |
|
||||
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) |
|
||||
| P10-04 functional/data verification | PARTIAL | 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in [P10-04](../redesign/phase-10/P10-04.md) |
|
||||
| P10-05 full acceptance | OPEN | Full local backend passed 1,448 tests. Frontend run, independent audit and preservation closure tracked in [P10-05](../redesign/phase-10/P10-05.md) |
|
||||
| P10-05 full acceptance | OPEN | Full local backend passed 1,448 tests. Full frontend passed 1,031 tests across 112 suites. Independent audit and preservation closure remain open. See [P10-05](../redesign/phase-10/P10-05.md) |
|
||||
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
|
||||
| A3 UI/UX modernisation | IM10 IN PROGRESS | Owner approved IM09 and IM10. Visual comparison, outstanding route states, combined qualification and final Gate F remain open |
|
||||
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
|
||||
|
||||