docs(roadmap): record widget locale and unapplied date fixes
This commit is contained in:
@@ -37,3 +37,5 @@ Earlier homepage and qualification findings remain in their branch reports. Add
|
||||
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
|
||||
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
|
||||
|
||||
|
||||
Resolved: shared Material labels ignored live UI language (cb9d0397); Edit Job invented an application date for null/invalid records (138f1ee6). Targeted and rendered evidence is published through e6240ad3. Legacy timestamps and final integrated acceptance remain open.
|
||||
|
||||
@@ -1,5 +1,12 @@
|
||||
# Direct execution continuation
|
||||
|
||||
## 11 November shared controls and unapplied-date continuation
|
||||
|
||||
- A3 source/evidence published and remotely read back at `e6240ad309bb1c73fb9110c954ca81e7dea74440`. Shared MUI locale source `cb9d0397` and evidence `5a92ae3b` use installed component defaults at the live UI-language boundary, preserving parent theme/defaults. Twenty tests/four suites, build, final TypeScript and lint passed. Nine paired rendered journeys/27 scans verified EN/NB control labels, company selection, drafts and unchanged colour scheme;126 committed source/evidence/export bindings passed.
|
||||
- Date source `138f1ee6` fixes a newly reproduced contract violation: Edit fabricated today for null/empty/invalid DateApplied. The existing backend explicitly requires null for unapplied jobs. Three new regressions failed before the two fallback changes. Fourteen affected cases/two suites passed in Los Angeles, plus build/TypeScript and lint. Nine extended paired desktop/tablet/mobile journeys/36 scans/27 intercepted fixture writes passed, including Saved/null rename/save with revision7 in all configurations.136 committed source/evidence/export bindings passed. No historical data repair or backend contract change.
|
||||
- Reports in A3: `docs/i18n/SHARED_WIDGET_LOCALISATION.md`, `docs/ui-modernisation/UNAPPLIED_DATE_PRESERVATION.md` and the earlier `visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`. These runs overlap; do not sum their test/journey counts. All API traffic is fixture-intercepted; no database/provider/native/release qualification is inferred. Older export manifests remain bound to their original builds, not the newer export.
|
||||
- Next eligible work: remaining IM10 route/error/recovery states and connected Career/document, application/follow-up and correspondence/Settings journeys. Valid legacy timestamp loading/display precision remains open; the null-date fix does not decide its timezone semantics. Final Phase10 D02, A3 GateF, launch selection, provider and security/recovery/release gates remain unchanged. No orchestrator, main merge, deployment, model or real provider activation.
|
||||
|
||||
## 11 November flat Edit Job continuation
|
||||
|
||||
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
|
||||
|
||||
@@ -3,7 +3,7 @@
|
||||
11 November 2026.
|
||||
|
||||
1. Phase 10 candidate qualification and independent final-proposal review are complete. Owner decision D02 covers the concrete Conditional GO package published at `59fd674f`, retaining inherited qualifications. Keep it queued while independent work continues. Further removal requires its own proven candidate and approval.
|
||||
2. Continue approved A3-IM10 from published `d027754d` on `codex/a3-ui-10`. Both existing native discovery specs now pass all11 cases, including the repaired shared confirmation focus. Date-only input/default fixes passed seven cases in each of three timezone processes. Next close remaining route/state and connected-workflow coverage in V06/V07, including correspondence/Settings/import states and actual date-widget browser interaction. Retain source-bound evidence and final Gate F. Do not rerun the accepted11 discovery cases solely to resume.
|
||||
2. Continue approved A3-IM10 from published `e6240ad3` on `codex/a3-ui-10`. Both existing native discovery specs now pass all11 cases, including the repaired shared confirmation focus. Date-only input/default fixes passed seven cases in each of three timezone processes. Next close remaining route/state and connected-workflow coverage in V06/V07, including correspondence/Settings/import states Actual picker/shared-widget and Saved/null edit interaction is now qualified in nine finite desktop/tablet/mobile configurations; valid legacy timestamp semantics remain open. Retain source-bound evidence and final Gate F. Do not rerun the accepted11 discovery cases solely to resume.
|
||||
3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
|
||||
4. Four desktop/mobile launch concept pairs are published at `ccb11494`. Retain owner selection before refinement and final approval before implementation. Release `3cca4418` includes RR-11/13 fixes and RR-12 post-rollback probes, with six offline rollback/twelve backup tests and corrected legacy-runbook scope. Actual recovery, integrated security and production remain separately gated.
|
||||
5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
|
||||
@@ -11,4 +11,4 @@
|
||||
|
||||
Use [the complete roadmap TODO](ROADMAP_TODO.md), [the latest checkpoint](LATEST_CHECKPOINT.md) and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch.
|
||||
|
||||
Edit Job V39 is qualified/published at c172427f; do not repeat its nine paired journeys. Continue shared MUI UI-language defaults, remaining route/state walkthroughs and eligible localisation checks. Retain Phase 10 D02 and final A3 gates.
|
||||
Edit Job V39 is qualified/published at c172427f; do not repeat its nine paired journeys. Shared MUI defaults are now qualified at 5a92ae3b; null Applied-date preservation at e6240ad3. Continue remaining route/state walkthroughs and eligible localisation checks. Retain Phase 10 D02 and final A3 gates.
|
||||
|
||||
@@ -11,11 +11,11 @@ Updated 11 November 2026. This register records direct-chat work. See [the conti
|
||||
| P10-04 candidate functional/data verification | QUALIFIED WITH INHERITED LIMITS | Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward |
|
||||
| P10-05 full acceptance | READY FOR OWNER REVIEW | Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at `59fd674f`. D02 final milestone decision pending. See [proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md) |
|
||||
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
|
||||
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `d027754d`. Latest96 selected frontend tests and all11 native discovery cases passed, plus earlier scoped application/drawer/saved matrices. Shared confirmation and date-input/default defects fixed. Outstanding route/workflow/human qualification and final Gate F remain open |
|
||||
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `e6240ad3`. Flat Edit dialog, live shared-widget locale defaults and null Applied-date preservation qualified. Latest14 date/revision cases, earlier20 shared/theme cases and29 flat-dialog cases overlap. Final extended matrix9 journeys/36 scans passed; prior source-bound96 frontend/11 native discovery evidence retained. Remaining routes/workflows and final Gate F open |
|
||||
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
|
||||
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
|
||||
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
|
||||
| I18N-01–08 implementation/acceptance | PARTIAL | Bounded EN/NB improvements including real picker locale binding published through A3 `89c553cb`. Six finite date-widget journeys/18 scans passed. Other MUI labels, legacy precision, native review and additional locale publication remain open |
|
||||
| I18N-01–08 implementation/acceptance | PARTIAL | Shared MUI/picker EN/NB defaults published through A3 `e6240ad3`. Live controls/drafts/theme verified in finite paired configurations. Legacy timestamp precision, broader visible-text/native review and additional locale publication remain open |
|
||||
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral contracts at `af8c48ce` and rendered baseline reconciliation at `98483b80`. Design research, asset rights and public claims remain open |
|
||||
| LAUNCH-01 four desktop/mobile concepts | PUBLISHED FOR REVIEW | Gallery and eight rendered screenshots at `ccb11494`. 20 controlled browser checks passed |
|
||||
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Owner selection or combination is next. Refine and obtain final design approval before application implementation |
|
||||
@@ -31,4 +31,3 @@ Implemented, tested, accepted, published and production-ready are separate. Prod
|
||||
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
|
||||
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
|
||||
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
|
||||
|
||||
|
||||
@@ -58,7 +58,7 @@ Updated 11 November 2026. This is the cross-phase work list. The source prompts,
|
||||
|
||||
- [ ] **I18N-00** Close full surface and catalogue inventory and locale priorities. All 188 historical dynamic call reviews are accounted for. Full visible text and locale acceptance remain open.
|
||||
- [ ] **I18N-01** Locale registry, locale aliases/legacy NB, persisted user choice, fallback/negotiation, formatting and migration. Keep UI, job and document languages independent.
|
||||
- [ ] **I18N-02** All React copy, navigation, form/dialog/error/loading states, accessibility, responsive text expansion and language switch continuity. Picker locale binding and actual date-widget checks are published through A3 `89c553cb`, with25 affected tests and six finite real-widget journeys/18 scans. Legacy date/timestamp display/loading, other MUI internal labels, native and broader European coverage remain open.
|
||||
- [ ] **I18N-02** All React copy, navigation, form/dialog/error/loading states, accessibility, responsive text expansion and language switch continuity. Installed picker and Material component defaults are bound to live EN/NB through A3 `e6240ad3`. Twenty shared/theme tests and the final extended nine real-widget journeys/36 scans passed (overlapping prior checks). Null/invalid Applied dates now remain blank/null, with14 affected tests. Valid legacy timestamp precision, remaining explicit component labels, native and broader European coverage remain open.
|
||||
- [ ] **I18N-03** API error codes, validation, mail, notifications, background/operational messages, locale persistence and fallbacks.
|
||||
- [ ] **I18N-04** Career Profile, Docling/import review, CV and letter editors, generated content, templates and PDF. Preserve document language and revision fidelity.
|
||||
- [ ] **I18N-05** Multilingual discovery, occupation names, aliases, matching, provider languages and regional formatting. Coordinate with GJ.
|
||||
@@ -168,3 +168,5 @@ Source index: Phase 10 and Product Review prompts 5–6, Global Jobs prompt 7 an
|
||||
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
|
||||
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
|
||||
|
||||
|
||||
Latest independently validated A3 increments: flat Edit Job `c172427f`, shared widget locale `5a92ae3b`, unapplied-date preservation `e6240ad3`. See LATEST_CHECKPOINT.md for exact overlapping counts and remaining gates.
|
||||
|
||||
Reference in New Issue
Block a user