docs(roadmap): record widget locale and unapplied date fixes

This commit is contained in:
cesnimda
2026-11-11 13:28:32 +01:00
parent bd49f80931
commit 7e07c233f5
5 changed files with 16 additions and 6 deletions
+2 -3
View File
@@ -11,11 +11,11 @@ Updated 11 November 2026. This register records direct-chat work. See [the conti
| P10-04 candidate functional/data verification | QUALIFIED WITH INHERITED LIMITS | Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward |
| P10-05 full acceptance | READY FOR OWNER REVIEW | Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at `59fd674f`. D02 final milestone decision pending. See [proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md) |
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `d027754d`. Latest96 selected frontend tests and all11 native discovery cases passed, plus earlier scoped application/drawer/saved matrices. Shared confirmation and date-input/default defects fixed. Outstanding route/workflow/human qualification and final Gate F remain open |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `e6240ad3`. Flat Edit dialog, live shared-widget locale defaults and null Applied-date preservation qualified. Latest14 date/revision cases, earlier20 shared/theme cases and29 flat-dialog cases overlap. Final extended matrix9 journeys/36 scans passed; prior source-bound96 frontend/11 native discovery evidence retained. Remaining routes/workflows and final Gate F open |
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
| I18N-01–08 implementation/acceptance | PARTIAL | Bounded EN/NB improvements including real picker locale binding published through A3 `89c553cb`. Six finite date-widget journeys/18 scans passed. Other MUI labels, legacy precision, native review and additional locale publication remain open |
| I18N-01–08 implementation/acceptance | PARTIAL | Shared MUI/picker EN/NB defaults published through A3 `e6240ad3`. Live controls/drafts/theme verified in finite paired configurations. Legacy timestamp precision, broader visible-text/native review and additional locale publication remain open |
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral contracts at `af8c48ce` and rendered baseline reconciliation at `98483b80`. Design research, asset rights and public claims remain open |
| LAUNCH-01 four desktop/mobile concepts | PUBLISHED FOR REVIEW | Gallery and eight rendered screenshots at `ccb11494`. 20 controlled browser checks passed |
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Owner selection or combination is next. Refine and obtain final design approval before application implementation |
@@ -31,4 +31,3 @@ Implemented, tested, accepted, published and production-ready are separate. Prod
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.