docs(roadmap): seal current development continuation

This commit is contained in:
cesnimda
2026-11-11 13:31:31 +01:00
parent 7e07c233f5
commit 7e4e20ba03
2 changed files with 4 additions and 0 deletions
+2
View File
@@ -1,5 +1,7 @@
# Direct execution continuation
Current published A3 ref: b9bb3c44de13888dae4083f47f5e08f40af62ffc. Application source remains 138f1ee6; 291b1e52 clarifies the existing backend Saved-date guard, and b9bb3c44 records V40/V41. Final136 source/evidence/export checks passed. Remaining generated graph/TestResults files are untracked and preserved. Next: IM10 correspondence/Settings/import error and recovery states, connected workflows, then remaining native/human review. No immediate new owner decision is needed for that independent work; existing Phase10 D02 and final A3/release gates remain pending.
## 11 November shared controls and unapplied-date continuation
- A3 source/evidence published and remotely read back at `e6240ad309bb1c73fb9110c954ca81e7dea74440`. Shared MUI locale source `cb9d0397` and evidence `5a92ae3b` use installed component defaults at the live UI-language boundary, preserving parent theme/defaults. Twenty tests/four suites, build, final TypeScript and lint passed. Nine paired rendered journeys/27 scans verified EN/NB control labels, company selection, drafts and unchanged colour scheme;126 committed source/evidence/export bindings passed.
+2
View File
@@ -170,3 +170,5 @@ Source index: Phase 10 and Product Review prompts 5–6, Global Jobs prompt 7 an
Latest independently validated A3 increments: flat Edit Job `c172427f`, shared widget locale `5a92ae3b`, unapplied-date preservation `e6240ad3`. See LATEST_CHECKPOINT.md for exact overlapping counts and remaining gates.
Current development ref b9bb3c44 includes V40/V41 disposition and the explicit backend Saved-date guard clarification. The frontend/date request defect is fixed; stored-data corruption was not reproduced.