docs: record full design reassessment and preserved gates
This commit is contained in:
@@ -0,0 +1,518 @@
|
|||||||
|
# Jobjakt — FULL DESIGN REASSESSMENT + CONTINUOUS ROADMAP DEVELOPMENT
|
||||||
|
|
||||||
|
## Owner direction
|
||||||
|
|
||||||
|
I want to reassess the entire Jobjakt design.
|
||||||
|
|
||||||
|
Although significant A3 implementation work has been completed, I am not entirely happy with the result.
|
||||||
|
|
||||||
|
**I am now open to completely redesigning Jobjakt from the ground up.**
|
||||||
|
|
||||||
|
I mean a genuinely new UI/UX direction, not another incremental restyling of the current application.
|
||||||
|
|
||||||
|
However, I also want you to continue working on EVERYTHING ELSE in my existing roadmap concurrently wherever safe.
|
||||||
|
|
||||||
|
Do not freeze the wider development backlog while we explore the design.
|
||||||
|
|
||||||
|
There are three parallel objectives:
|
||||||
|
|
||||||
|
A. Independently establish whether the existing A3 redesign is actually complete.
|
||||||
|
|
||||||
|
B. Explore a completely fresh Jobjakt experience, with no commitment to retaining A3's visual design or information architecture.
|
||||||
|
|
||||||
|
C. Continue implementing every other independently authorised roadmap task.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
# PART A — Verify A3 completion
|
||||||
|
|
||||||
|
First, inspect the actual repository, worktrees, commits, application and authoritative records.
|
||||||
|
|
||||||
|
Latest reported checkpoints:
|
||||||
|
|
||||||
|
- Application: `2c5d0451`
|
||||||
|
- Roadmap: `8d17e01c`
|
||||||
|
|
||||||
|
Verify the true current state.
|
||||||
|
|
||||||
|
Read:
|
||||||
|
|
||||||
|
- `docs/direct-roadmap/ROADMAP_TODO.md`
|
||||||
|
- `docs/direct-roadmap/ROADMAP_STATUS.md`
|
||||||
|
- `docs/direct-roadmap/LATEST_CHECKPOINT.md`
|
||||||
|
- A3 design handoff and implementation records.
|
||||||
|
- IM01–IM10 acceptance evidence.
|
||||||
|
- Applicable Phase 10 and preservation requirements.
|
||||||
|
|
||||||
|
Audit all 34 routes and 57 preservation groups.
|
||||||
|
|
||||||
|
Determine:
|
||||||
|
|
||||||
|
- Which redesign milestones are implemented.
|
||||||
|
- Which are properly tested.
|
||||||
|
- Which have owner approval.
|
||||||
|
- Which are incomplete.
|
||||||
|
- Which have outstanding visual discrepancies.
|
||||||
|
- Which are awaiting real backend, mobile, accessibility or security qualification.
|
||||||
|
- Whether any old design patterns remain.
|
||||||
|
|
||||||
|
Capture current real application screenshots at desktop, tablet and mobile widths.
|
||||||
|
|
||||||
|
Check English, Norwegian, light and dark modes.
|
||||||
|
|
||||||
|
Do not declare the redesign complete merely because components were migrated or tests passed.
|
||||||
|
|
||||||
|
Produce a clear conclusion:
|
||||||
|
|
||||||
|
- COMPLETE AND ACCEPTED.
|
||||||
|
- IMPLEMENTED BUT AWAITING ACCEPTANCE.
|
||||||
|
- PARTIALLY IMPLEMENTED.
|
||||||
|
- INCOMPLETE.
|
||||||
|
|
||||||
|
Explain the result with evidence.
|
||||||
|
|
||||||
|
The owner has not granted final A3 visual acceptance.
|
||||||
|
|
||||||
|
Do not silently close that gate.
|
||||||
|
|
||||||
|
Also reconcile the recovered CV journey proposal whose baseline still requires verification.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
# PART B — Complete UX rethink from scratch
|
||||||
|
|
||||||
|
## 1. Start with a blank design canvas
|
||||||
|
|
||||||
|
I am explicitly releasing the design exploration from previous A3 visual constraints.
|
||||||
|
|
||||||
|
You may fundamentally rethink:
|
||||||
|
|
||||||
|
- Visual identity.
|
||||||
|
- Colour system.
|
||||||
|
- Typography.
|
||||||
|
- Navigation.
|
||||||
|
- Page structure.
|
||||||
|
- Information architecture.
|
||||||
|
- Dashboard.
|
||||||
|
- Application tracking.
|
||||||
|
- Job discovery.
|
||||||
|
- CV Builder.
|
||||||
|
- Career Profile.
|
||||||
|
- Cover letters.
|
||||||
|
- Calendar.
|
||||||
|
- Correspondence.
|
||||||
|
- Onboarding.
|
||||||
|
- Settings.
|
||||||
|
- Mobile navigation.
|
||||||
|
- Desktop workflows.
|
||||||
|
- Admin interface.
|
||||||
|
- Shared design system.
|
||||||
|
|
||||||
|
Do not simply rearrange the existing cards.
|
||||||
|
|
||||||
|
Do not assume A3's sidebar, dashboard layout, editor position or existing interaction patterns must survive.
|
||||||
|
|
||||||
|
Evaluate them on their merits.
|
||||||
|
|
||||||
|
**The new interface should feel like an entirely new product.**
|
||||||
|
|
||||||
|
However, preserve the underlying application functionality and data integrity.
|
||||||
|
|
||||||
|
A new UI does not automatically require rewriting the backend, authentication system, database or other stable infrastructure.
|
||||||
|
|
||||||
|
Assess whether frontend architectural replacement is justified rather than assuming it is.
|
||||||
|
|
||||||
|
## 2. Research modern UX
|
||||||
|
|
||||||
|
Research successful contemporary SaaS products, job-search platforms, productivity applications, career tools and CV builders.
|
||||||
|
|
||||||
|
Examples worth examining include FlowCV, Linear, Notion, Teal and Huntr, alongside other relevant products.
|
||||||
|
|
||||||
|
Assess actual current interfaces rather than assuming past designs remain unchanged.
|
||||||
|
|
||||||
|
Study:
|
||||||
|
|
||||||
|
- Navigation simplicity.
|
||||||
|
- Information density.
|
||||||
|
- Visual hierarchy.
|
||||||
|
- Form usability.
|
||||||
|
- Responsive behaviour.
|
||||||
|
- Search and filtering.
|
||||||
|
- Progressive disclosure.
|
||||||
|
- Onboarding.
|
||||||
|
- Document editing.
|
||||||
|
- Status and workflow management.
|
||||||
|
- Accessibility.
|
||||||
|
- Perceived performance.
|
||||||
|
|
||||||
|
Identify patterns worth adopting.
|
||||||
|
|
||||||
|
Avoid copying another product's branding, assets or complete design.
|
||||||
|
|
||||||
|
## 3. Design for every jobseeker
|
||||||
|
|
||||||
|
Jobjakt is not a software-developer-only application.
|
||||||
|
|
||||||
|
It must work intuitively for people seeking work in:
|
||||||
|
|
||||||
|
- Technology.
|
||||||
|
- Healthcare.
|
||||||
|
- Education.
|
||||||
|
- Retail.
|
||||||
|
- Hospitality.
|
||||||
|
- Construction.
|
||||||
|
- Engineering.
|
||||||
|
- Administration.
|
||||||
|
- Public services.
|
||||||
|
- Skilled trades.
|
||||||
|
- And other occupations.
|
||||||
|
|
||||||
|
It must support beginners and experienced users.
|
||||||
|
|
||||||
|
Avoid interfaces that look like internal enterprise administration software.
|
||||||
|
|
||||||
|
Everyday users should understand important actions without technical knowledge.
|
||||||
|
|
||||||
|
Keep advanced features accessible without displaying every control at once.
|
||||||
|
|
||||||
|
## 4. European-first architecture
|
||||||
|
|
||||||
|
This remains non-negotiable.
|
||||||
|
|
||||||
|
Support the existing European expansion requirements:
|
||||||
|
|
||||||
|
- All 24 official EU languages.
|
||||||
|
- The approved additional European languages.
|
||||||
|
- Country-aware job searching.
|
||||||
|
- Accurate country-specific maps.
|
||||||
|
- Canonical geographic filtering.
|
||||||
|
- International occupations.
|
||||||
|
- Correct regional conventions.
|
||||||
|
- Multilingual documents.
|
||||||
|
- Independent UI, search and document language settings.
|
||||||
|
|
||||||
|
Design for longer translations and different writing systems from the beginning.
|
||||||
|
|
||||||
|
Do not design English-only screens and treat localisation as an afterthought.
|
||||||
|
|
||||||
|
## 5. Explore five genuinely distinct directions
|
||||||
|
|
||||||
|
Produce FIVE different high-fidelity design concepts.
|
||||||
|
|
||||||
|
They must differ meaningfully in:
|
||||||
|
|
||||||
|
- Information architecture.
|
||||||
|
- Navigation.
|
||||||
|
- Workspace organisation.
|
||||||
|
- Visual design.
|
||||||
|
- Density.
|
||||||
|
- Interaction patterns.
|
||||||
|
- Desktop and mobile behaviour.
|
||||||
|
|
||||||
|
Suggested starting points:
|
||||||
|
|
||||||
|
**Concept A — Minimal Productivity Workspace**
|
||||||
|
Fast, clean, understated, excellent information density.
|
||||||
|
|
||||||
|
**Concept B — Friendly Career Workspace**
|
||||||
|
Approachable, guided, welcoming and easy for beginners.
|
||||||
|
|
||||||
|
**Concept C — Career and Document Studio**
|
||||||
|
Strong focus on creating CVs, building profiles and preparing applications.
|
||||||
|
|
||||||
|
**Concept D — Premium Career Platform**
|
||||||
|
Distinctive branding, sophisticated interaction and polished consumer-product quality.
|
||||||
|
|
||||||
|
**Concept E — Your Own Recommendation**
|
||||||
|
An original direction based on the strongest research and an independent assessment of Jobjakt.
|
||||||
|
|
||||||
|
Do not produce five versions of the same layout with different colours.
|
||||||
|
|
||||||
|
Do not constrain the concepts to A3.
|
||||||
|
|
||||||
|
## 6. Show complete user experiences
|
||||||
|
|
||||||
|
For every concept, include representative desktop and mobile screens:
|
||||||
|
|
||||||
|
- Dashboard.
|
||||||
|
- Job discovery.
|
||||||
|
- Application list.
|
||||||
|
- Application details.
|
||||||
|
- Career Profile.
|
||||||
|
- CV Builder.
|
||||||
|
- Cover letters.
|
||||||
|
- Calendar.
|
||||||
|
- Correspondence.
|
||||||
|
- Settings.
|
||||||
|
- Administration.
|
||||||
|
- First-time onboarding.
|
||||||
|
|
||||||
|
Use realistic synthetic content.
|
||||||
|
|
||||||
|
Show actual density, states, controls and workflows.
|
||||||
|
|
||||||
|
Include light and dark themes.
|
||||||
|
|
||||||
|
Demonstrate how layouts adapt to mobile rather than simply shrinking desktop.
|
||||||
|
|
||||||
|
Explore how users move through complete journeys, including:
|
||||||
|
|
||||||
|
Discover job → inspect → save → apply → track → follow up.
|
||||||
|
|
||||||
|
Career Profile → prepare CV → review → export.
|
||||||
|
|
||||||
|
Interview invitation → calendar → preparation → follow-up.
|
||||||
|
|
||||||
|
## 7. Create working prototypes
|
||||||
|
|
||||||
|
Produce real, clickable browser prototypes where feasible.
|
||||||
|
|
||||||
|
I want to experience the different approaches, not merely read design descriptions.
|
||||||
|
|
||||||
|
Provide:
|
||||||
|
|
||||||
|
- A concept gallery.
|
||||||
|
- Desktop previews.
|
||||||
|
- Mobile previews.
|
||||||
|
- Interactive navigation.
|
||||||
|
- Representative editing interactions.
|
||||||
|
- Light/dark switching.
|
||||||
|
- English/Norwegian previews.
|
||||||
|
- Screenshots.
|
||||||
|
- A comparison of strengths, weaknesses and tradeoffs.
|
||||||
|
|
||||||
|
Use the approved development environment and synthetic data.
|
||||||
|
|
||||||
|
Do not deploy these prototypes to production.
|
||||||
|
|
||||||
|
If external inspiration or imagery is used, respect usage rights and attribution.
|
||||||
|
|
||||||
|
## 8. Challenge existing design decisions
|
||||||
|
|
||||||
|
Do not assume the current navigation is best.
|
||||||
|
|
||||||
|
Consider whether Jobjakt really needs its existing number of navigation destinations.
|
||||||
|
|
||||||
|
Explore grouping functionality into intuitive areas such as:
|
||||||
|
|
||||||
|
- Home.
|
||||||
|
- Explore.
|
||||||
|
- Applications.
|
||||||
|
- Career.
|
||||||
|
- Calendar.
|
||||||
|
- Account.
|
||||||
|
|
||||||
|
These are illustrative, not mandatory.
|
||||||
|
|
||||||
|
Think about whether jobs, correspondence, documents, interviews and follow-ups should be connected within one application workspace instead of spread across unrelated pages.
|
||||||
|
|
||||||
|
Look for opportunities to reduce the number of clicks needed to complete everyday tasks.
|
||||||
|
|
||||||
|
Keep advanced features discoverable.
|
||||||
|
|
||||||
|
Avoid excessive boxes inside boxes.
|
||||||
|
|
||||||
|
Use typography, spacing and purposeful layout divisions rather than decorative cards everywhere.
|
||||||
|
|
||||||
|
Do not mistake minimalism for hiding functionality.
|
||||||
|
|
||||||
|
## 9. Evaluate implementation strategies
|
||||||
|
|
||||||
|
Compare at least:
|
||||||
|
|
||||||
|
A. Thorough redesign using the existing React/component architecture.
|
||||||
|
|
||||||
|
B. Major frontend restructuring with new shared architecture and components.
|
||||||
|
|
||||||
|
C. A fresh frontend implementation built around the existing backend APIs.
|
||||||
|
|
||||||
|
Assess:
|
||||||
|
|
||||||
|
- Expected design freedom.
|
||||||
|
- Risk to preserved functionality.
|
||||||
|
- Development effort.
|
||||||
|
- Testing and migration cost.
|
||||||
|
- Accessibility.
|
||||||
|
- Performance.
|
||||||
|
- Maintainability.
|
||||||
|
- European localisation.
|
||||||
|
- Compatibility with current workstreams.
|
||||||
|
|
||||||
|
Recommend the best approach with evidence.
|
||||||
|
|
||||||
|
Do not automatically choose the most expensive rewrite.
|
||||||
|
|
||||||
|
Do not begin replacing the production frontend without owner approval.
|
||||||
|
|
||||||
|
## 10. Owner design review
|
||||||
|
|
||||||
|
Once the five concepts and comparison are ready, present them for review.
|
||||||
|
|
||||||
|
I want to be able to:
|
||||||
|
|
||||||
|
- Choose a preferred concept.
|
||||||
|
- Combine features from different concepts.
|
||||||
|
- Reject individual visual patterns.
|
||||||
|
- Request changes.
|
||||||
|
- Continue iterating until I am satisfied.
|
||||||
|
|
||||||
|
Do not assume I will choose the first recommended design.
|
||||||
|
|
||||||
|
Do not begin full replacement implementation until I explicitly approve the selected direction and implementation strategy.
|
||||||
|
|
||||||
|
While waiting for design feedback, continue independently authorised work elsewhere in the roadmap.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
# PART C — Continue everything else
|
||||||
|
|
||||||
|
This is equally important.
|
||||||
|
|
||||||
|
**The new design exploration must NOT stop the rest of Jobjakt development.**
|
||||||
|
|
||||||
|
Continue the previously approved maximum-backlog execution directive.
|
||||||
|
|
||||||
|
Work through the entire existing TODO, including:
|
||||||
|
|
||||||
|
- Phase 10 eligible acceptance and integrity work.
|
||||||
|
- Product Review preparation.
|
||||||
|
- International Global Job Search.
|
||||||
|
- European localisation.
|
||||||
|
- EUROPE-READY geographic support.
|
||||||
|
- All applicable performance optimisations.
|
||||||
|
- Public homepage work within approved scope.
|
||||||
|
- Security and dependency remediation.
|
||||||
|
- Release readiness.
|
||||||
|
- Database and operational improvements.
|
||||||
|
- Existing technical debt.
|
||||||
|
- Outstanding functional and integration defects.
|
||||||
|
|
||||||
|
Respect existing gates.
|
||||||
|
|
||||||
|
Do not use the potential redesign as an excuse to abandon substantial previously completed work.
|
||||||
|
|
||||||
|
## Parallel execution
|
||||||
|
|
||||||
|
Where Codex supports safe parallel workers, establish independent ownership.
|
||||||
|
|
||||||
|
Suggested workstreams:
|
||||||
|
|
||||||
|
**Worker A — Existing A3 audit**
|
||||||
|
Establish actual completion and preservation status.
|
||||||
|
|
||||||
|
**Worker B — From-scratch UX research and concepts**
|
||||||
|
Produce new design options and prototypes without modifying live application behaviour.
|
||||||
|
|
||||||
|
**Worker C — European expansion**
|
||||||
|
Continue localisation, geographical architecture and independently authorised Global Jobs work.
|
||||||
|
|
||||||
|
**Worker D — Backend, security and performance**
|
||||||
|
Continue validated backend optimisations, dependency remediation, data integrity and operational improvements.
|
||||||
|
|
||||||
|
Use actual worker availability and reasonable hardware limits.
|
||||||
|
|
||||||
|
Run fewer workers if necessary.
|
||||||
|
|
||||||
|
Workers must not collide on shared files or mutable databases.
|
||||||
|
|
||||||
|
Assign separate branches/worktrees where appropriate.
|
||||||
|
|
||||||
|
## Avoid wasted implementation
|
||||||
|
|
||||||
|
Since we may replace the visual design completely, deprioritise discretionary cosmetic polishing of existing A3 components.
|
||||||
|
|
||||||
|
Still fix:
|
||||||
|
|
||||||
|
- Security vulnerabilities.
|
||||||
|
- Data loss.
|
||||||
|
- Incorrect functionality.
|
||||||
|
- Accessibility failures.
|
||||||
|
- User-isolation problems.
|
||||||
|
- High-impact defects.
|
||||||
|
|
||||||
|
Continue implementation of reusable business logic, APIs, localisation infrastructure, data models, tests and other design-independent work.
|
||||||
|
|
||||||
|
Do not remove accepted functionality because its existing presentation might be replaced.
|
||||||
|
|
||||||
|
## Continuous progress
|
||||||
|
|
||||||
|
After every validated implementation package:
|
||||||
|
|
||||||
|
1. Update the authoritative TODO.
|
||||||
|
2. Record tests and evidence.
|
||||||
|
3. Commit and publish when authorised.
|
||||||
|
4. Select the next independently eligible backlog task.
|
||||||
|
5. Continue immediately.
|
||||||
|
|
||||||
|
Do not stop merely to deliver small milestone summaries.
|
||||||
|
|
||||||
|
Maintain separate statuses for:
|
||||||
|
|
||||||
|
- Existing A3 completion.
|
||||||
|
- New redesign research.
|
||||||
|
- New redesign owner approval.
|
||||||
|
- New redesign implementation.
|
||||||
|
- Wider roadmap implementation.
|
||||||
|
- Final product acceptance.
|
||||||
|
|
||||||
|
Do not falsely mark the proposed redesign as implemented.
|
||||||
|
|
||||||
|
## Approval and safety boundaries
|
||||||
|
|
||||||
|
Maintain all existing restrictions:
|
||||||
|
|
||||||
|
- No autonomous orchestrator.
|
||||||
|
- No merge into main.
|
||||||
|
- No production deployment.
|
||||||
|
- No destructive migrations.
|
||||||
|
- No unapproved third-party costs.
|
||||||
|
- No bypassing mandatory owner decisions.
|
||||||
|
- No unqualified production AI/provider activation.
|
||||||
|
- No removal of protected historical data or functionality.
|
||||||
|
- No claims of acceptance without evidence.
|
||||||
|
|
||||||
|
Use prior verified test evidence where still applicable.
|
||||||
|
|
||||||
|
Batch owner decisions where possible.
|
||||||
|
|
||||||
|
However, the new design selection is an explicit mandatory owner gate.
|
||||||
|
|
||||||
|
Do not self-approve it.
|
||||||
|
|
||||||
|
## Required deliverables
|
||||||
|
|
||||||
|
### A3 assessment
|
||||||
|
A factual report explaining whether the existing redesign is complete, partial or awaiting acceptance.
|
||||||
|
|
||||||
|
### New design exploration
|
||||||
|
Five distinct interactive visual concepts with desktop/mobile coverage, screenshots and a comparative recommendation.
|
||||||
|
|
||||||
|
### Implementation recommendation
|
||||||
|
A reasoned comparison of updating, restructuring or replacing the frontend.
|
||||||
|
|
||||||
|
### Preservation analysis
|
||||||
|
Evidence showing how all current functionality and routes can survive a new design.
|
||||||
|
|
||||||
|
### Roadmap progress
|
||||||
|
Completed implementation, test results, commits, published changes, blockers and remaining authorised tasks.
|
||||||
|
|
||||||
|
### Owner decisions
|
||||||
|
A consolidated design-review package plus any other genuinely blocked decisions.
|
||||||
|
|
||||||
|
## Final directive
|
||||||
|
|
||||||
|
Begin immediately.
|
||||||
|
|
||||||
|
**Assess A3, explore a completely new Jobjakt design, and keep developing the remaining roadmap concurrently wherever safely possible.**
|
||||||
|
|
||||||
|
I am open to starting the user experience over from the ground up.
|
||||||
|
|
||||||
|
Do not restrict the exploration to the old A3 design.
|
||||||
|
|
||||||
|
Do not discard existing application functionality.
|
||||||
|
|
||||||
|
Do not pause other independent development work while design choices await my review.
|
||||||
|
|
||||||
|
Make substantial progress for as long as the execution environment permits.
|
||||||
|
|
||||||
|
The objective is to build the best possible Jobjakt experience for European jobseekers, not simply finish the existing design checklist.
|
||||||
@@ -1,5 +1,12 @@
|
|||||||
# Direct execution continuation
|
# Direct execution continuation
|
||||||
|
|
||||||
|
## Full design reassessment authorised
|
||||||
|
|
||||||
|
Owner directive archived in DESIGN_REASSESSMENT_DIRECTIVE.md; SHA256 5b7fc4f837569f01286ba57fa07954d6fafae716611a3898387c595314a72de5. Exploration is released from A3 visual/navigation constraints. Five NEW distinct clickable concepts are requested; preserve original A3 prototypes and all functionality. No replacement implementation until explicit selected-direction AND strategy approval. A3 final visual acceptance remains absent. Separate statuses: existing A3 audit ACTIVE; new research/prototypes PENDING; new owner approval PENDING; replacement implementation NOT AUTHORISED; wider roadmap CONTINUES. All24 EU/all60 planned locale scope retained. Deprioritise discretionary A3 cosmetics; continue integrity/accessibility/business logic/performance and other eligible work.
|
||||||
|
|
||||||
|
Read-only/report worker design_reassessment_audit dispatched for34routes/57groups and IM01–10; owns only docs/ui-modernisation/reassessment/A3_ASSESSMENT.md. Second research worker creation failed at agent thread limit; no research/prototype work claimed. Root must perform research/prototypes sequentially or reuse an available worker without idle retries. Next: reconcile CV proposal baseline, inspect current official product interfaces, build five new concepts in an isolated design lab, capture real application desktop/tablet/mobile EN/NB light/dark separately. Existing checkpoint8d17e01c and A3 reported2c5d0451 remain baseline pending fresh audit.
|
||||||
|
|
||||||
|
|
||||||
## Recovery audit continuation
|
## Recovery audit continuation
|
||||||
|
|
||||||
Roadmap encoding repair798c410e published/refverified; verified c18c69f8 historical checkpoint/status preserved verbatim with legitimate new entries.36 non-orchestrator worktrees inspected; snapshot retained at E:/Storage/Projects/Active/temp docs/jobjakt-local-build/browser-restoration-20261117/recovery-worktrees.json. Main checkout unrelated dirty files untouched. A3 remote2c5d0451 and performance remote2a212c78 verified.
|
Roadmap encoding repair798c410e published/refverified; verified c18c69f8 historical checkpoint/status preserved verbatim with legitimate new entries.36 non-orchestrator worktrees inspected; snapshot retained at E:/Storage/Projects/Active/temp docs/jobjakt-local-build/browser-restoration-20261117/recovery-worktrees.json. Main checkout unrelated dirty files untouched. A3 remote2c5d0451 and performance remote2a212c78 verified.
|
||||||
|
|||||||
@@ -1,5 +1,12 @@
|
|||||||
# Direct roadmap status
|
# Direct roadmap status
|
||||||
|
|
||||||
|
## Full design reassessment authorised
|
||||||
|
|
||||||
|
Owner directive archived in DESIGN_REASSESSMENT_DIRECTIVE.md; SHA256 5b7fc4f837569f01286ba57fa07954d6fafae716611a3898387c595314a72de5. Exploration is released from A3 visual/navigation constraints. Five NEW distinct clickable concepts are requested; preserve original A3 prototypes and all functionality. No replacement implementation until explicit selected-direction AND strategy approval. A3 final visual acceptance remains absent. Separate statuses: existing A3 audit ACTIVE; new research/prototypes PENDING; new owner approval PENDING; replacement implementation NOT AUTHORISED; wider roadmap CONTINUES. All24 EU/all60 planned locale scope retained. Deprioritise discretionary A3 cosmetics; continue integrity/accessibility/business logic/performance and other eligible work.
|
||||||
|
|
||||||
|
Read-only/report worker design_reassessment_audit dispatched for34routes/57groups and IM01–10; owns only docs/ui-modernisation/reassessment/A3_ASSESSMENT.md. Second research worker creation failed at agent thread limit; no research/prototype work claimed. Root must perform research/prototypes sequentially or reuse an available worker without idle retries. Next: reconcile CV proposal baseline, inspect current official product interfaces, build five new concepts in an isolated design lab, capture real application desktop/tablet/mobile EN/NB light/dark separately. Existing checkpoint8d17e01c and A3 reported2c5d0451 remain baseline pending fresh audit.
|
||||||
|
|
||||||
|
|
||||||
## 18 November combined journeys and user-summary projection published
|
## 18 November combined journeys and user-summary projection published
|
||||||
|
|
||||||
A3 `2c5d04513eb02a9b3771fde5c27ea3e378fc5d92` published/ref-readback verified. Combined browser evidence171e616b integrated213793c1: fresh Release API on combined checklist/analytics source plus unchanged qualified export;4/4 connected discovery/calendar cases,8scans/8screenshots,0violations,0skips/flaky. Prior distinct-case counts overlap; no full/native-language/visual acceptance.
|
A3 `2c5d04513eb02a9b3771fde5c27ea3e378fc5d92` published/ref-readback verified. Combined browser evidence171e616b integrated213793c1: fresh Release API on combined checklist/analytics source plus unchanged qualified export;4/4 connected discovery/calendar cases,8scans/8screenshots,0violations,0skips/flaky. Prior distinct-case counts overlap; no full/native-language/visual acceptance.
|
||||||
|
|||||||
@@ -278,3 +278,11 @@ Next integrity investigation:AttachmentStorage snapshot cleanup ownership (sourc
|
|||||||
|
|
||||||
- [x] **Combined connected backend/browser qualification**.171e616b integrated213793c1, published/refverified;4cases/8scans/8captures pass on fresh combined API with unchanged export. Earlier cases overlap; broader/native-language/visual acceptance remains open.
|
- [x] **Combined connected backend/browser qualification**.171e616b integrated213793c1, published/refverified;4cases/8scans/8captures pass on fresh combined API with unchanged export. Earlier cases overlap; broader/native-language/visual acceptance remains open.
|
||||||
- [x] **User-list summary SQL projection**.2a212c78 integrated2c5d0451, published/refverified;49to10 selected columns,12 affected ordinary cases+2 actual MariaDB safety fixtures pass,AST/source/native receipts committed. Full Users paging remains open.
|
- [x] **User-list summary SQL projection**.2a212c78 integrated2c5d0451, published/refverified;49to10 selected columns,12 affected ordinary cases+2 actual MariaDB safety fixtures pass,AST/source/native receipts committed. Full Users paging remains open.
|
||||||
|
|
||||||
|
## Full design reassessment (new owner direction)
|
||||||
|
|
||||||
|
- [ ] Independently audit A3:34routes/57groups,IM01–10 evidence,owner gates,current rendered desktop/tablet/mobile EN/NB light/dark; no final acceptance inferred.
|
||||||
|
- [ ] Research current public interfaces and create five distinct clickable concepts covering all12 requested screen families and connected journeys. Preserve original prototypes.
|
||||||
|
- [ ] Compare existing-component redesign,major frontend restructure,and new API-backed frontend; preserve functionality/data/routes.
|
||||||
|
- [ ] Present consolidated concept/strategy review; explicit owner approval required before replacement implementation.
|
||||||
|
- [ ] Continue wider authorised roadmap and recovered CV journey while design exploration proceeds.
|
||||||
|
|||||||
Reference in New Issue
Block a user