3 November 2026 - NEWEST DEVELOPMENT CHECKPOINT: **ccf8d26426235a7a54903162e539d9d613058465** on active **codex/a3-ui-10** is published and independently remotely verified.17 source/23 evidence hashes match committed bytes;80 export assets separately hashed. Approved scope remains **"Approve IM09 and A3-IM10"**; no further implementation permission needed for this increment. Narrow attachment-size delta1ce93ca0 was reconciled/cherry-picked as31ce70271663a5d57c7b2eb8f80cd69be5cc95ef. Fresh63 affected cases plus61 studio cases=124 distinct cases/three suites passed. Review caption now uses the existing EN/NB label; UI-language change retains proposal/output language without regeneration/apply.16 controlled review journeys/axe scans passed with zero writes/synthetic proposals. Types/lint/build and independent review passed; existing direct-focus act warnings remain.
Source census passed: all34 inherited route patterns present in the TypeScript AST; complete57-group preservation register hash unchanged from d3d33837, preserving56 PARTIAL/one DEFERRED and required closures. Source membership is not route runtime/auth or whole-capability acceptance. Evidence: docs/ui-modernisation/CROSS_APP_LOCALISATION.md, UI-10.md and evidence/cross-app in direct-roadmap-integration. Original imported61-case localisation artifacts remain historical; do not rerun their old manifests against a newer application tree as if they bind it.
IM10 remains OPEN. Next authorised work is secondary-route connected/responsive/accessibility qualification and the group-by-group evidence reconciliation, followed by combined affected regression and a consolidated A3 acceptance proposal. Seven secondary suites (companies/offers/operations/analytics/public auth/public CV/legacy relink) were started after ccf8d264; record their actual result before making claims. No IM10 acceptance question has been issued. Mounted AI entitlement refresh and granular Ghosted pause remain OPEN. Full Phase10/Global Jobs/European/public launch/final integrated security/recovery/release/native/provider qualifications remain separate. No orchestrator/pre-P10/main/production changes.
3 November 2026 - NEWEST: owner explicitly answered **"Approve IM09 and A3-IM10"**. IM09 Gate F ACCEPTED; do not repeat. Implementation **773c943165669bfc97bee46c53f73f124f398c0c** on codex/a3-ui-09 is published and independently remotely verified.45 source/143 evidence hashes match committed bytes;80 export assets separately hashed.143 distinct frontend cases/11 suites and69 local backend cases passed, plus types/lint/build. Final distinct browser coverage128 states across16 configurations:112 retained plus16 processing successors. Initial labels/column and reproduced precommit focus-race defects were fixed;19 processing cases replace18 earlier ones in the142-case full run. Do not add overlapping attempts/pilots. All API responses are synthetic, confirmations cancelled, exports fixture403; no real account/provider/model/production operation.
Acceptance receipt **7a9de940dfdc41023f87a1ef38a5fd86a0b8e477** records the explicit decision. Active integration worktree now isolates **codex/a3-ui-10** from that receipt. Next authorised scope: cross-application consistency, all preserved secondary routes, responsive/localisation/accessibility and combined affected regression. Reconcile the narrow published attachment-size delta1ce93ca0 against this newer baseline; keep all existing owners/contracts. IM08 granular Ghosted pause and mounted AI entitlement-refresh gaps remain OPEN. Final human/native-language, real provider/model, integrated security/recovery/hosted CI and release gates remain separate. No orchestrator/pre-P10/main/deploy changes.
IM09 evidence: docs/ui-modernisation/ACCOUNT_ADMIN_VALIDATION.md and ACCOUNT_ADMIN_PUBLICATION.md in direct-roadmap-integration. Older NEWEST/CURRENT sections below are historical and superseded by this record.
3 November 2026 - NEWEST: owner explicitly answered **"Approve IM08 and A3-IM09"**. IM08 Gate F ACCEPTED; do not repeat. Implementation **e2327c1fa2ceaf785d4058c802bafe0d3428c235**, branch codex/a3-ui-08, is published and independently remotely verified.35 source/108 evidence hashes match committed bytes;80 export assets separately hashed.131 distinct frontend cases/eight suites,68 local backend cases,types/full lint/build passed.16 controlled journeys/96 scoped accessibility scans/captures passed across EN/NB,light/dark,320/390/768/1440. Pilots/review/capture refreshes overlap. API/model/preview responses are fixtures: no live inference, semantic quality, provider, physical PDF or backend end-to-end claim. Earlier bounded context fix a88310481fbfa7701478043e8bf192ee45c7c28e is also published/verified. Acceptance receipt f0c8c6d321a70b4d477e99c7b9557246b6361cdf records the owner decision.
Next authorised increment: **A3-IM09** account/security/session/connections/data and administration/processing presentation. Preserve authentication/recovery/RBAC/owner boundaries, last-admin/self restrictions, task-state permissions, safe diagnostics and export/delete confirmations. No actual deletion for visual verification. Record the actual isolated branch/base before editing; retain Gate F before IM10. IM08 evidence:docs/ui-modernisation/AI_SETTINGS_VALIDATION.md and AI_SETTINGS_PUBLICATION.md in direct-roadmap-integration.
IM08 OPEN gaps: six numeric thresholds cannot pause per-user automatic Ghosted processing; saved AI preferences require full page reload to rehydrate mounted entitlement presentation. Backend enforcement remains authoritative. Milestone acceptance does not close these gaps. Automation uses the existing persisted email switch and links to AI/privacy, thresholds and per-search alerts; no workers/models/providers were activated.
Independent localisation **1ce93ca0e3a906673e636e56f1b910756ca78bb2**, codex/i18n-attachment-sizes in i18n-00-audit, is published and independently remotely verified. Attachment KB/MB labels now use EN/NB numeric separators, retaining existing units/precision and frozen data/downloads.61 full affected tests/two suites,types/scoped lint/build/static review passed;seven committed source/evidence hashes match. Keep the delta isolated until reconciled against the newer A3 baseline. All188 historical dynamic-call reviews remain accounted for; full European localisation remains OPEN.
The chronological CURRENT statements below are superseded by this newest checkpoint. Full Phase10/Product Review/Global Jobs, native/provider, final integrated security/recovery/hosted CI and release acceptance remain open. Root SECURITY policy de3d5031 remains isolated; calendar interview scheduling and original precision/timezone metadata remain explicit data gaps. Orchestrator/pre-P10/main/production untouched.
3 November 2026 — CURRENT: owner explicitly answered **"Approve calendar/documents/mail and A3-IM08"**. UI07 Gate F ACCEPTED; do not repeat. Implementation **fba80ef346bc021e675024638dacf9ccef7243db** on codex/a3-ui-07 is published and independently remotely verified;28 source/169 evidence manifest entries match committed bytes,80 export assets separately hashed.108 distinct frontend cases/8 suites,52 backend cases,types/lint/build passed.48 final calendar plus96 document/mail axe scans:144 distinct captures across32 controlled journey executions. Calendar displays recorded closing dates including Saved applications; no guessed interview times.32 draft/save/send responses were intercepted fixtures, not real deliveries. Source-review reruns70+7 overlap108. Full Phase10/security/release/native/provider acceptance remains open.
Active integration worktree is now **codex/a3-ui-08**, from fba80ef3. Acceptance receipt **e5a979386d6377138e7ea7fd44958adb22838886** is published and independently remotely verified. Approved scope:contextual AI presentation and Settings automation, manual fallback, explicit consent/review/apply, stale inputs, usage/limits, error/retry/cancel and per-rule control explanations. No live model activation. Current source inspection:SettingsView,RulesSettingsCard,AiPrivacySettingsCard,AiUsageCard,AiSectionAssistant. Ordinary application automation controls are in scope; autonomous backlog orchestrator remains paused and untouched. No UI08 implementation changes yet.
IM07 evidence:docs/ui-modernisation/WORKSPACE_VALIDATION.md and WORKSPACE_PUBLICATION.md. Existing interview scheduling and original date precision/timezone data are explicit gaps; milestone acceptance does not invent them or waive data qualification. Independent ca519cac date fix was narrowly integrated into UI07 with matching blobs; separate localisation branch retained. de3d5031 root SECURITY policy is still isolated. All188 historical dynamic-call reviews accounted for; European localisation remains incomplete. Fixed-decimal attachment size display remains an eligible bounded localisation candidate.
Next required milestone gate is UI08 review before IM09 account/admin/session/connections views. Phase10 final acceptance, Product Review/Global Jobs provider/data dependencies, European native-language/market decisions, public homepage visual/claims approval, staging/paid/final security, hosted recovery/CI and production release gates remain OPEN. No orchestrator/pre-P10/main/deploy changes.
Earlier chronological records below are historical; later explicit approvals supersede their pending statements.
**Newest owner decision: "Approve discovery and A3-IM06".** Discovery Gate F c9c6b1abc1f87a907d1e37062cfa5e2ed3fd933c is ACCEPTED. UI05 implementation is published/remotely verified with zero committed-manifest mismatches.32 frontend/3 suites,14 mocked-provider/local backend cases, types/lint/build passed;16 controlled search/save/pause/run/dismiss/confirmed-delete journeys,48 axe scans/captures, zero violations/unexpected writes/page errors.80 fixture-intercepted mutations, no live backend/provider calls. Independent reviewer23 overlaps32. Global Jobs remains distinct and unaccepted.
Next authorised A3-IM06: Career Profile overview and CV/library/editor/templates/import-review/cover-letter presentation, editor left/preview right; preserve canonical owner, null-as-inherit, undo/save queues/conflicts/history/frozen packages/RD21. No CV-import engine overhaul. Do not repeat prior UI01–05 milestone approval questions. Record actual isolated UI06 branch/base before editing. Pending full Phase10/security/release/native/provider qualifications remain unchanged. A bounded source check also found fixed-decimal attachment-size formatting still present in ApplicationAssets/Attachments; retain this as an open EN/NB localisation candidate rather than claiming every visible number is qualified.
**Newest owner decisions:****"Approve applications and A3-IM05"** and **"Approve policy creation and publication"** received3 November2026. Application-tracking Gate F98e9502a is ACCEPTED. Integration worktree now isolates codex/a3-ui-05 from published/verified UI04 receipt172074e90f3c7067b1cbc7e65724b303c2fc9ff6. UI05 changes existing discovery presentation/saved-search UX only; no new provider/geography implementation.32 selected frontend and14 mocked-provider/InMemory/SQLite backend tests pass; browser qualification still in progress. UI-05.md is the active ledger. UI04/Nav/dashboard refs remain unchanged.
Root security policy `de3d5031c8208bc3841a528ae100ec2984d68501` on codex/security-offline-preflight is published/independently remotely verified. Exact approved41-line policy matches candidate; real resolver now includes root for API/UI and root+nearer CV-doc policy. See docs/security/ROOT_POLICY_APPROVAL.md there. Policy skill workflow completed; no baseline/deep/final scan, charge or staging access is approved/performed. Current integration target/capability/cost preflight and final integrated security remain open. Security policy is not silently merged into A3. No root-policy approval question should be repeated.
**Latest implemented/published increment:**`98e9502af5039429fb6da45353e719a27e8aa22d`, codex/a3-ui-04, independently remotely verified; committed source/evidence manifest has zero mismatches. B1 quiet table/board surfaces and persistent right application context implemented; narrow/compact layouts put context after task with jump/return focus. Existing table/board/action/revision owners retained. Fixed reproduced null-nextStep false readiness claim in EN/NB. Final126 selected frontend tests/10 disjoint suites and88 targeted InMemory/SQLite backend tests passed; typecheck/full lint/build passed.16 controlled React search/board/precise-status/detail/context/return journeys,48 whole-page axe scans/captures, zero violations/unexpected writes/page exceptions.16 status PATCHes were intercepted fixture responses, not backend writes. Independent reviewer52 cases overlap126. No native/MariaDB/live provider/model/security/release qualification.
Application-tracking Gate F → A3-IM05 is pending in this chat. Do not start dependent discovery presentation until answered; new international provider implementations retain separate GJ prerequisites/rights. Existing dashboard/nav approvals remain accepted. Review `docs/ui-modernisation/APPLICATIONS_VALIDATION.md` and APPLICATIONS_PUBLICATION.md in integration worktree. UI04 source remains distinct from independent ca519cac document-date patch. Phase10 final acceptance and wider roadmap stay open; these targeted UI counts do not qualify them.
**Newest decision:** owner answered **"Approve dashboard/onboarding and A3-IM04"** on3 November2026. Dashboard Gate F is ACCEPTED; no repeat approval question. Integration worktree now isolates `codex/a3-ui-04` from UI03 receipt `dc93b589c995f4edcc48f658ddde571356d6dd86` (published and independently verified). UI03 remains on its own ref. Next work is B1 applications table/Kanban/full detail with context right; see UI-04.md task ledger. Original integration ref remains d3d33837. No main merge/deployment.
Independent localisation `ca519cacbec6ee8e385927ad31356dacc18b2f2d` on codex/i18n-document-dates is published/remotely verified; committed manifest matches. Reproduced/fixed invalid uploaded wall-clock date rollovers, overflow and trailing junk;40 frontend tests/3 suites, typecheck, scoped lint/build pass. Four historical direct catalogue accesses contextually reviewed; full current literal/backend inventory still open. Not combined with A3 yet; preserve branch separation and integrate only its small accepted patch with combined regression when needed.
**UI03 published:**`c7d26d354c44b0bdd2976cf2f1c2b0737d7cc2d2` on `codex/a3-ui-03`, push succeeded and independent remote readback matched. Committed manifest: zero mismatches. Dashboard/onboarding Gate F question is pending in this chat before A3-IM04; independent localisation remains eligible. Details: `docs/ui-modernisation/DASHBOARD_VALIDATION.md` and `DASHBOARD_PUBLICATION.md` in the integration worktree. Commit emitted unrelated Windows long-path warnings for Codex turn-diff checkpoint refs; real feature commit/publication succeeded, no infrastructure repair performed.
3 November 2026 — newest owner decision: **"Approve navigation and A3-IM03"**. Navigation Gate F992608c7 is ACCEPTED; do not repeat that question. A3-IM03 is implemented in the existing integration worktree on isolated branch `codex/a3-ui-03`, based on992608c7 plus only the independent metadata patch d4b938fa cherry-picked as5e8a07d1. Original integration/UI01/UI02 refs remain unchanged. Dashboard/onboarding qualification and publication receipt follow; earlier navigation-pending text below is historical.
Current UI03 work: new/reset A1 task-first defaults, separate movable agenda widget using explicitly limited recorded attention-feed dates, personal greeting from recorded names, optional owner-scoped resumable setup/skips and on-demand walkthrough. Existing nine widgets/layout geometry/CAS/collisions and source-backed completion remain. Additive agenda whitelist only; no database migration.95 frontend tests/12 suites and36 isolated SQLite backend layout tests pass. Typecheck/full lint/build pass;32 controlled browser scans/captures across16 configurations show zero axe violations;16 synthetic layout saves, no source-data guidance writes. Independent review found no actionable issue; its45 tests overlap95. These are not full Phase10/security/release or native/provider qualifications. See UI03 branch `docs/ui-modernisation/DASHBOARD_VALIDATION.md`. Next dependent owner gate is dashboard/onboarding review before A3-IM04; do not start it from navigation approval alone.
3 November 2026 — newest: owner attachment `a178edeb-c3ef-4c0e-b4c2-bcd1ca84b90b` explicitly ACCEPTS foundation Gate F (`bdd1de0d`, receipt `0d6de714`) and authorises navigation. Do not repeat foundation/final-A3 approval questions. Required later milestone gates remain distinct; ordinary independent work is authorised while awaiting them.
**A3 navigation IMPLEMENTED / TESTED / PUBLISHED; owner review pending.** Commit `992608c77f01d26220d086b2cdc55a3722b88ca5`, branch `codex/a3-ui-02`, independently remotely verified. Existing integration worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` is now on that branch; original integration ref stays d3d33837 and UI-01 ref stays0d6de714. Reuses AppShell/router/MUI drawer, desktop collapse/storage, five mobile destinations and More, retained secondary tools/admin flags, measured content/scroll/toast clearance, source-bound EN/NB and theme behaviour. Discovery promoted to primary; existing workspace destinations retained. Fixed current-route drawer-close/focus defect and320px label wrapping. All57 groups/34 route declarations retained; no backend/data/renderer/dependency changes.
Fresh navigation evidence: **49 tests /9 suites PASSED**, typecheck/lint/build PASSED; **56 scoped axe sweeps with zero violations**,56 captures. Actual React browser lane:32 screen conditions at320/390/768/1440 EN/NB/light/dark,16 company dialogs,8 More drawers;16 configurations with4 primary route transitions, focus/collapse/More checks, local fixture company save and phone feedback clearance.16 PUTs were intercepted/fulfilled by browser fixtures; no real backend writes.40 existing Google font requests aborted. Core route content may show unavailable-service states: routing checks are not successful backend/domain qualification. Independent source review had no important/critical findings; final committed source/evidence manifest verified. See `docs/ui-modernisation/UI-02.md` and `NAVIGATION_VALIDATION.md` in that branch. Prototype counts are separate historical evidence.
**Navigation Gate F → A3-IM03 is OPEN.** A concise approval question was submitted in this chat after publication. Exact next scope: approved A1 dashboard hierarchy and optional resumable onboarding through existing DashboardView/grid/layout/checklist owners, retaining schema-2/CAS, hidden geometry/gaps, collision handling, drag/resize/keyboard alternatives and existing-data skip/resume. Do not start that dependent increment until owner review is received. Do not treat the foundation approval as blanket later-gate approval. Other independent roadmap work remains eligible under its own gates.
**Independent static I18N fix IMPLEMENTED / TESTED / PUBLISHED.** Commit `d4b938fafbf10541b62134293cea8299f25c4031`, `codex/i18n-build-metadata`, independently remotely verified. Existing i18n worktree `C:\Users\Connor\.codex\worktrees\i18n-00-audit\Job tracker` now uses that integration-derived branch from d3d33837; original codex/i18n-accessible-labels ref remains4172c23d. Reproduced Bokmål mobile menu showing literal `commit`; now uses existing localised version/revision key, retaining version-only fallback and caller-controlled admin metadata visibility. **24 tests /5 suites, typecheck, scoped zero-warning lint and fresh production build PASSED**. No new locale keys or historical dynamic-call review changes. Native report/source manifest verified. No fresh browser/live-service qualification for this separate branch. See `docs/i18n/MOBILE_BUILD_METADATA.md`. Do not add its overlapping existing suites to navigation's49 as a unique combined total.
The I18N patch is **not combined** with frozen navigation review992608c7. After navigation approval, reconcile the next UI baseline and port only its small AppShell hunk/test; never merge the older integration/theme tree wholesale. Run combined targeted metadata/navigation/language evidence after that integration. Full European localisation remains OPEN; all188 historical dynamic reviews remain accounted for, and navigation added four new static EN/NB keys only.
Design approval continuity is local-only at `3d6976be` on codex/product-modernisation; original A3 prototype237c79b8 and five concepts remain unchanged. No design-branch push. AST-only Graphify updates ran locally; generated graphs remain untracked. Prior orchestrator/pre-P10 worktrees are untouched. No main merge, deployment, destructive migration, provider access or model activation.
Wider roadmap stays OPEN: Phase10 final acceptance (no new deletion candidate), Product Review/full A3 implementation, GJ predecessor/provider permissions, European market/native localisation, homepage visual/claims approval, final integrated security and live recovery/hosted CI/release qualifications. Existing scoped evidence remains applicable only to its source-bound scope. No human/native-device/screen-reader/actual-zoom, physical PDF/container, provider/model, production or final security pass is inferred. The following entries are historical and superseded where they still describe foundation Gate F as pending.
3 November 2026 — latest: final A3 design/implementation authorisation RECEIVED in owner attachment137309c9-7463-4c4c-9b1c-6fb689d588d7. Gates C/D/E approved for that stated scope; do not ask for the same final A3 approval again. Verbatim text is committed in implementation branch `docs/ui-modernisation/A3_APPROVAL.md`. Design approval status updated locally at `b7051a3e` on restricted/local-only codex/product-modernisation; frozen prototype remains237c79b8, no new concept.
Actual A3 implementation checkpoint `bdd1de0dd3259e4e9e9f46c81948f865317c6054`, subsequent evidence/review receipt `0d6de71403015b0e44ca410d0ce2b844b75b893d`, branch `codex/a3-ui-01` in the existing `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` isolated worktree. Original codex/direct-roadmap-integration ref remains at d3d33837. Branch was created from that accepted integration, not by merging the older design tree. Existing theme.ts now implements D1 semantic palette/navigation colours, typography, quiet surfaces and shared controls. Actual sidebar structure, A1 dashboard and other feature layouts are NOT yet implemented. Theme/controls are A3-IM01, only part of owner UI-01.
Fresh implementation evidence:30 theme/state/dialog tests in5 suites plus5 disjoint CV-thumbnail/navigation tests in2 suites, all passed; baseline28 and reviewer16 overlap and are not added. Full typecheck, lint, static production build passed. Real built React with controlled API fixtures:32 screen conditions at320/390/768/1440, EN/NB and light/dark;16 company-dialog keyboard journeys;48 scoped axe sweeps, zero violations;32 screenshots. No page exceptions or backend writes. All32 inherited Google font requests were blocked, not fetched. Native JSON, screenshots and source/export-asset manifest committed. Independent code review found no important/critical findings. Final committed manifest verified. No backend/live-service/model/provider/native/human/physical-PDF/final security qualification claimed; actual browser zoom remains untested. Source/route/data/renderer contracts preserved; only shared theme application source changed.
Publication now works without repair: normal push and independent remote read-back confirmed implementation bdd1de0d. Subsequent documentation receipt0d6de714 pushed; latest read-back receipt recorded in this chat. Design branch remains unpublished by its specific restriction. Older connection-failure entries below remain historical actual results, not current publication status.
UI Gate F remains OPEN before A3-IM02 navigation: the approved handoff at237c79b8 explicitly says "Owner milestone review before next increment" for A3-IM01. Review the actual implementation evidence at docs/ui-modernisation/UI-01.md and VALIDATION.md in codex/a3-ui-01. After that review, proceed through approved navigation scope without repeating ordinary-change approvals. Do not infer Gate F approval from the earlier generic continue message sent before this validated checkpoint existed. Other independent work remains eligible under its original Phase10/provider/native/security/recovery gates. No orchestrator or pre-P10 changes, main merge or deployment.
All prior final-A3-approval-pending text below is historical and superseded by the explicit attachment authorisation above. All188 historical dynamic-call reviews remain accounted for; full European localisation, Phase10 acceptance, integrated security and release readiness remain open.
3 November 2026 — newest design checkpoint: `237c79b8cb3e280d7e4d1ef95cdbb2c77bb81c69` on local-only `codex/product-modernisation`, worktree `C:\Users\Connor\.codex\worktrees\product-modernisation\Job tracker`. Consolidated A3 http://127.0.0.1:4317/a3.html; handoff `docs/product-modernisation/08-a3-handoff/README.md` in that worktree. Owner explicitly confirmed A3: original A1 dashboard, D1 foundation, B1 tracking, editor left/preview right, application context right, desktop grouped sidebar/hybrid mobile, overview-first Career Profile, agenda-first calendar/month preference and automation under Settings. Do not restart five-concept exploration. Final production design/implementation approval remains OPEN (Gates C/D/E); no production UI replacement was authorised or implemented.
Publication result: local roadmap receipt `3eca2df0ad396544e4d2d1a60b4aed7164f127dc` committed successfully. Normal push to origin/feature/phase10-cleanup FAILED: `Failed to connect to git.cesnimda.uk:443 after 21119 ms: Could not connect to server`. Independent `git ls-remote --heads` also FAILED to connect after 21106 ms. No remote publication or verification is claimed for this receipt or the subsequent failure-record commit. Retry normal phase-branch publication/read-back when the existing remote becomes reachable; do not repair Gitea, change infrastructure or publish the restricted design branch.
Fresh isolated prototype evidence: 480 unique screen/layout/state conditions (320 populated + 160 generic states), 496 helper render/overflow calls including overlaps, 11 scoped behaviour checks, 44 screenshots and 50 scoped axe sweeps with zero returned violations. 57 inherited groups mapped (56 PARTIAL/1 DEFERRED retained), 34 inherited route strings confirmed in integration source. New direct profile edit/progress, local widget/calendar preferences, letter history/dirty navigation/optional fixed suggestion, account/session and processing-monitor interactions. Source/evidence manifest verified against committed Git bytes using LF-normalised text/raw PNG hashes. AST-only graph refresh completed locally (18,902 nodes/46,671 edges); generated graph remains untracked. Not real application E2E, full WCAG/native/device acceptance, provider/AI operation, Phase 10 or security/release acceptance. Advanced existing controls are explicitly retained components rather than fully simulated lab functionality.
Design commit is **not pushed or remotely verified**, under the design workshop's existing publication restriction. This primary continuation receipt may be published through the normal authorised Phase 10 development-branch workflow; it does not publish the design branch. Integration remains `d3d338376444b8abdcaf7200f682faa3daf1ad10` and earlier continuation `aa36075bef21385610c7522bf9fa8d7fc929fe89`; do not merge the older design branch application tree wholesale into integration. After explicit final approval, create implementation increments from the reconciled integration baseline and retain Gate F milestone reviews.
Next owner action: review the consolidated A3 handoff and explicitly approve or request changes to the final design system and proposed ten-milestone production implementation roadmap. Independent ordinary work remains eligible in the appropriate existing worktrees: localisation context/literals and European QA architecture, bounded source security remediation/review, remaining Phase 10 qualification, design-neutral launch preparation and offline release qualification. Do not represent this design review gate as blocking every unrelated package. Preserve provider/predecessor/native-language/homepage-visual/security-scan/staging/live-recovery/hosted-CI gates. No orchestrator access, pre-P10 modification, main merge or production deployment.
All older entries below are historical; use the latest counts and source-specific receipts above rather than reopening already reviewed 188 dynamic-call inventory entries.
Newest direct execution checkpoint: isolated combined application review branch `codex/direct-roadmap-integration` published and independently verified at `d3d338376444b8abdcaf7200f682faa3daf1ad10`, worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker`. It preserves approved CLEAN-20 and integrates exact validated I18N/backup paths, with no change to accepted automation handoff records, API sources or workflow configuration. See its docs/direct-roadmap/INTEGRATION_CHECKPOINT.md. Fresh combined checks: 195 selected frontend tests in 16 suites; full typecheck/lint/build; five mocked backup-function tests and Bash syntax, all passed. Additional catalogue QA: 10 tests in three suites; subsequent language-control QA: 17 tests in three suites, with overlap explicitly retained separately. Latest runtime language-control fix has its own fresh passing production build. Native JSON reports archived. No fresh browser, final integrated security, real provider/model, live restore or production qualification.
I18N finite key-domain census COMPLETE at published/read-back `4172c23d7ce13e8327a5e51bbb09f296c24fb9b8`: all 188 historical indices accounted for, 108 original + 80 supplemental, zero pending. Register schema 3 declares LF-normalised reviewed-text hashes for checkout portability, preserves original historical hashes, and distinguishes repeated same-line calls by immutable inventory index. This does not close every-string context, direct access/backend literals, European registry/native/plural/market or release gates. Tests enforce equal EN/Bokmål keys, placeholder sets and nonblank values across 3,119 keys per language; resources and translations were not invented or published for candidate locales. Only integration branch additionally contains the new catalogue tests, supported-language native-name/NB control fix and corrected JobFlowBar caller note. Prefer that branch for further ordinary integrated development.
Phase 10 separately published/read-back `db818e5ebd19eeedc05ae58dc3f7a908ce0e713d`: 14 new disjoint AttachmentConsistencyTests passed; selected backend coverage now 103, frontend Phase 10 coverage remains 92. P10-05 remains OPEN; do not claim complete regression/acceptance. Security source matrix follow-through published/read-back `88bcd6d91c6823ffc6bbc6a6de176ab7769e729f`: actual relational ownership denial evidence identified; HTTP/missing-owner/list/upload/MariaDB/final scan gaps retained. No Codex Security scan launched; desktop workflow references read, setup/capability/cost/scope and final integrated gates remain separate.
Homepage preparation published/read-back `af8c48ce7090f2c56bc8f9a47494b440312ec12a` on feature/launch-site-redesign: design-neutral content, locale and crawlable-HTML/SEO contracts; unchanged rendering-shell sources matched the available build, whose raw export lacked descriptive content/canonical/hreflang. No layout/route/metadata implementation or public marketing publication. Five application concepts and requested comparison ready in product-modernisation local-only commit `2f081e6f`: docs/product-modernisation/CONCEPT_COMPARISON.md and REVIEW_PACK.md, http://127.0.0.1:4317/gallery.html. No sixth concept and no final unapproved UI design implementation. Preserve design branch publishing restriction and all prior owner selections.
Next eligible work: use the integration branch for remaining literal/direct-access/localisation context work; continue bounded source audit without representing it as a plugin scan or final security gate; qualify full Phase 10/preservation evidence using unchanged source-bound results; complete detailed product journeys and review preparation without final design implementation. Remaining owner/environment gates: final design/implementation roadmap, locale market/native reviewer and Montenegrin identity, required predecessor acceptance/provider/data grants for GJ stages, approved public-site visuals/claims, scan policy/paid deep budget/named staging scope, isolated Linux recovery/hosted CI and production/human/device decisions. No orchestrator access, pre-P10 changes, main merge or deployment.
Current continuation after 2a4acc17: Phase 10 acceptance register published/read back at `6f29ed4cdb7b259318282f365d737f6cfdb6a682` (P10-05 remains OPEN). Fresh integrity check: 263 indexed artifact hashes and 1,279 retained source hashes match; only approved App.css absent. No extra deletion candidate.
I18N branch latest published/read-back `ebd33fcf0040ed7ebe659c75171873a88cdfc025`. Actual fixes: `2108ea50` session-change message uses existing EN/NB catalogue outside private providers; `7b132ec4` own-property guards for completeness/timeline unknown labels; `36db9322` inherited-name pipeline alias fallback. Selected runs separately: 17 session tests, 41 label/workflow tests, 29 pipeline/board tests, all passing. Typecheck and scoped lint passed for each implementation package. Static production build passed before the final one-line pipeline patch; do not claim a fresh final-pipeline build. Local AST graph update completed, 18,560 nodes / 46,020 edges; generated graphs untracked. Sanitized 17/41 native reports committed; pipeline native JSON remains ignored locally. DYNAMIC_RESOLUTION_REGISTER.json binds 18 individually matched supplemental call sites and reviewed source hashes to the original inventory: 126 resolved / 62 pending of 188, no duplicate counts. Final integrated security tests remain open until relevant application changes are complete.
3 November2026 reconciliation: parsed all four retained backend TRX artifacts and the frontend native JSON. **103 distinct historical backend cases**, zero case overlap/failure/skip; **92 historical frontend tests/5 suites** passed. [Machine reconciliation](p10-04-evidence/EVIDENCE_RECONCILIATION.json) retains uncompressed artifact hashes and counters. This is fresh evidence inspection, not fresh test execution. Application source under job-tracker-ui/src, JobTrackerApi and tools has no diff from the published cleanup checkpoint78f7396a to this branch's current documentation checkpoints.
Final A3 design/implementation approval is now received; dashboard and navigation milestone reviews are also accepted. A3 application-tracking implementation98e9502a is published separately and awaits its own Gate F. None of those UI branches, independent localisation fixes, or their selected test counts is integrated into this frozen cleanup branch or substituted for complete Phase10 qualification. Independent audit/preservation closure and the required environment/human qualifications remain open.
2 November 2026. This is an acceptance work register, not final acceptance. P10-01 CLEAN-20 is the only implemented deletion. P10-02/03 retain reviews found no additional proven-safe candidate. No further cleanup is authorised or needed merely to populate a checkpoint.
## Evidence applicability
@@ -11,7 +15,7 @@ Fresh integrity check at continuation from 2a4acc17: all 263 indexed TEST_EVIDEN
| Cleanup eligibility | CLEAN-20 blob/callers and narrow approval recorded in P10-00/01 | No additional deletion proven |
| Frontend types/lint/build | PASSED fresh for CSS deletion; P10-01 | Full-suite execution is not represented by these checks |
| Focused browser EN/NB/theme/responsive | PASSED five selected cases; P10-01 | Canary is not full browser regression or device acceptance |
| Routes/capabilities | Existing 34-route and 57-group reconciliation retained | 56 PARTIAL / one DEFERRED is not 57 accepted groups; independent closure review pending |
| Historical CV/document/PDF | Accepted source/fixture-bound evidence retained; affected document contracts freshly checked | No fresh physical/PDF visual metric acceptance; unchanged metrics must not be reopened without affected change |
@@ -23,7 +27,7 @@ Fresh integrity check at continuation from 2a4acc17: all 263 indexed TEST_EVIDEN
- CLEAN-20 implementation: locally validated and published; no further code cleanup proposed.
- Phase 10 completion: OPEN; full acceptance is not established by targeted counts or this report.
- Redesign completion and post-redesign Product Review acceptance: OPEN; new full-application design also requires final owner approval.
- Redesign completion and post-redesign Product Review acceptance: OPEN; final A3 design is approved and staged implementation is underway, with separate milestone and integrated qualification gates.
- Independent product/research/i18n/security offline work: may continue under the owner's direct parallel-work authorisation. Do not claim upstream acceptance or integrated release qualification for isolated branches.
- Production release: NO-GO. No merge or deployment authorised.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.