27 lines
3.0 KiB
Markdown
27 lines
3.0 KiB
Markdown
# P5-15 continuation — immediate commit/push ledger
|
|
|
|
Development branch `codex/ui-redesign-phase4`; no force pushes. Each completed unit below was pushed and remote=HEAD checked before the next independent unit. Other in-progress work was excluded explicitly. Final clean-tree proof is taken after the last documentation checkpoint; intermediate worktrees can contain the named unfinished diagnostic/report work. Production main stayed `27657f31131cd95d42f0e1290853ec9c9b3959a4`.
|
|
|
|
| Commit | Independently reviewable unit |
|
|
|---|---|
|
|
| `f55c761ac229a69357a1c5b68a06e837cfa31ec0` | docs(acceptance): plan bounded Phase 5 completion and Phase 6 handoff |
|
|
| `bab2730d9b547232a4154c62bacaa1bd61493a49` | test(a11y): reproduce native keyboard file-picker failures |
|
|
| `24c98e160fc28b5a092fee7dd37c1fd526293bf7` | test(cv): reproduce initially hidden preview pagination readiness |
|
|
| `57054349ef7816b84a31c29a8c847a734ab22479` | fix(a11y): restore native keyboard file selection |
|
|
| `c22f3fc753f48d17c09e1cccd0b694957905c77c` | fix(cv): wait for usable layout before preview pagination |
|
|
| `0401bc36ea201e786fe0821e7fe00b17c237e587` | test(a11y): trace drawer focus before visible transition |
|
|
| `b377f0f62f661bb7a63f1a2b784f22e8b9b52de4` | fix(a11y): recover mobile drawer focus after visible transition |
|
|
| `b5bda1caa58749c0171a83101fb4e3bf337c23e7` | fix(cv): link source editing to the existing Career Profile route |
|
|
| `5d9997f601b6df737d32dcfbc7b9d8a3b661f423` | test(cv): qualify preview exit across the autosave boundary |
|
|
| `a3ecca9599deef834d70e8edbeef3ab957a590e9` | test(acceptance): cover status targets and native photo inclusion |
|
|
| `22455bba0a016f0cefabde46c539df588f789667` | fix(a11y): size recorded-status drilldown targets |
|
|
| `b9525b8452c5d4789c64192fb3f5392641162bb7` | docs(acceptance): record native CV and document qualification |
|
|
| `ea48a3e39c2bd143a020aa79efe61bfc54a8b45a` | docs(release): retain production gates and operator evidence requirements |
|
|
| `d5d1b29ad9735b04fa9081f7aacc2d574c7ff75c` | docs(acceptance): reconcile bounded repairs across 57 preservation groups |
|
|
| `fef0c5d14bee755a902d8e605e8d1838c2d5ed14` | docs(acceptance): retain post-repair document and report visual evidence |
|
|
| `ec02bebbfa24c943eb7e2d97d76a55025cbb0f28` | docs(acceptance): classify scoped repairs and remaining verification debt |
|
|
| `eba7ad19c6f60d08528ae357db33a56e6fe05f9c` | docs(acceptance): record final native export and photo readback |
|
|
| `227e3b4a22a17d92ce59f74e69001df292e379fd` | test(acceptance): qualify preference concurrency and Board membership |
|
|
|
|
Final P5-15-06 evidence commit: **`9528504866054da10e20d5196e65de536c4c9499`**, pushed with remote=HEAD and clean tree; main unchanged. The [Phase6 planning](../../../phase-6/README.md) commit is reported after creation rather than inventing its own self-referential hash. Focused before/after evidence is in each repair record; full post-change commands/times/hashes and limits are in evidence/validation.json. No production CI/deployed smoke, human acceptance or configured-model qualification is claimed.
|