# Direct roadmap status
Updated 9 November 2026. This register records direct-chat work. See [the continuation checkpoint](LATEST_CHECKPOINT.md) for exact integration refs and evidence.
| Workstream/checkpoint | Status | Dependency and evidence |
| --- | --- | --- |
| PHASE-10 / P10-00 assessment | COMPLETED | Report in `../redesign/phase-10/P10-00.md`; assessment `7ba1367`, publication receipts `8cdff28`/`1692142`. Remote exactly `1692142295950e390a4cf807d9df86cc5cf96290` on 2 November |
| P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused `App.css` removal. Source and receipt at `78f7396a`. See [P10-01](../redesign/phase-10/P10-01.md) |
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) |
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) |
| P10-04 functional/data verification | PARTIAL | 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in [P10-04](../redesign/phase-10/P10-04.md) |
| P10-05 full acceptance | OPEN | Full local backend passed 1,448 tests. Frontend run, independent audit and preservation closure tracked in [P10-05](../redesign/phase-10/P10-05.md) |
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Owner approved IM09 and IM10. Visual comparison, outstanding route states, combined qualification and final Gate F remain open |
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
| I18N-01–08 implementation/acceptance | PARTIAL | Bounded EN/NB improvements tested and published. Later stage prerequisites, native review and additional locale publication remain separate |
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral content, locale and crawlable HTML/SEO contracts published at `af8c48ce`. Rendered design and public claims decisions remain open |
| LAUNCH-01 four desktop/mobile concepts | PENDING | No viewable concepts produced; eligible independent task after completing audit inputs |
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Four concrete concepts must be delivered before owner selection; no final design auto-selection |
| SECURITY-AUDIT-01 | OFFLINE PREFLIGHT PARTIAL | Approved root policy published at `de3d5031`. Formal integrated scan requires a completed application baseline and applicable environment/cost approval |
| RELEASE-READINESS-01 / discovery and RR-11 | PARTIAL | Parser fix `f19e7ebf` published with 31 offline tests. RR-12/13 still require isolated rollback, restore and off-host encryption evidence |
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).